background image

2

569000264

NOTE: Only qualified Personnel should install this Kit.

1. Disconnect Unit product inlet lines from product tanks, then open dispensing valves to relieve systems

pressures.

2. Disconnect electrical power from the Unit, open hinged top cover, then drain water tank.

CAUTION: Never use an ice pick or other instrument to remove ice from the refrigeration
system evaporator coils. Such practice can result in a punctured refrigeration circuit.

3. Allow ice to melt from the evaporator coils. Hot water may be used to speed up melting. All ice must be

melted from the evaporator coils.

4. Remove screws securing handle on the Unit, then remove handle.

5. Disconnect large black terminals labeled “A”, “B”, and “C” from the ice bank control module.

6. Remove screws securing the ice bank control module to the agitator motor assembly bracket.

7. Remove screw securing ice bank control module ground wire (connected to the large black terminal labeled

“A”)  to the agitator motor assembly bracket.

8. Disconnect the large black terminals electrical wires connectors from Unit wiring harness connectors.

9. Disconnect large black terminal labeled “D” from terminal on ice bank control labeled “D”. Retain old  ice

bank control which is to be returned to IMI Cornelius INC.

10. Disconnect product source product inlet lines from fittings on top of the agitator motor assembly bracket

(see Figure 3).

11. Remove hex nuts and white plastic washers securing Unit product inlet lines fittings in the agitator motor

assembly bracket.

12. Remove and retain six screws securing the agitator motor assembly bracket to the Unit, then remove agita-

tor motor assembly bracket from the Unit.

13. Disconnect product tubes from backs of the dispensing valves, then lift product coils assembly up out of

the Unit.

14. Remove old ice bank control probe and ice bank control probe holder from the evaporator coil. Retain old

ice bank control probe and probe holder which are to be returned to IMI Cornelius INC..

15. Remove right-side (facing front of Unit) access grille for access to the lower electrical control box.

16. Remove two screws securing the lower electrical control box to the Unit. Loosen, but do not remove, one

screw securing the electrical control box cover, then remove the cover.

17. Inside the lower electrical control box, remove wire nut connecting white electrical wire routed down

through inside corner of the Unit cabinet to inside of the control box, from a heavy white electrical wire in-
side the control box. Pull white electrical up out of inside corner of the Unit cabinet and discard.

18. Strip insulation from end of the heavy white wire inside the electrical control box, then install ELECTRICAL

WIRE TERMINAL (item 13) on end of the wire.

19. Connect heavy white wire, with terminal installed on it’s end, to empty terminal on one end of the terminal

block where two other white wires are connected.

20. Re–install lower electrical control box in the Unit, then install access grille.

INSTALLING ICE BANK CONTROL KIT

1. Install new Ice Bank Control Bulb Holder (item 6) on evaporator coils as shown in Figure 1.

2. Install O–Ring (item 7) on Ice Bank Control Bulb  as shown in Figure 2).

3. Insert end of the Ice Bank Control Bulb in the Ice Bank Control Bulb Holder.

4. Install  O–Ring (item 7) on Ice Bank Control Bulb  as shown in Figure 2 to secure control bulb in the holder.

Содержание Remcor 2849949020

Страница 1: ... before installing this kit Retain these instructions as part of your equipment manual Table 1 Loose Shipped Parts Item No Part No Name Qty 1 315794000 Ice Bank Control White Rodgers 1 2 3528 Box Ice Bank Control 1 3 186125000 Grommet 1 4 313457000 Label Hazard Shock 1 5 187188000 Screw Machine No 8 32 X 250 2 6 3529 Holder Control Bulb 1 7 180024000 O Ring 2 8 3575 Electrical Wire Black 1 9 3576 ...

Страница 2: ...y bracket to the Unit then remove agita tor motor assembly bracket from the Unit 13 Disconnect product tubes from backs of the dispensing valves then lift product coils assembly up out of the Unit 14 Remove old ice bank control probe and ice bank control probe holder from the evaporator coil Retain old ice bank control probe and probe holder which are to be returned to IMI Cornelius INC 15 Remove ...

Страница 3: ...on the ice bank control capillary tube then slide grommet up on the capillary tube and install in key hole slot in ice bank control box 16 Route Unit wiring harness electrical wires in through snap bushing installed in the ice bank control box 17 Connect Unit wiring harness green ground wire to ground lug inside the control box Secure ground con nection with HEX NUT item 14 18 Complete remainder o...

Страница 4: ...NK CONTROL PROBE LOCATION ICE BANK CONTROL BULB Î Î Î NO 3 COIL 6 500 IN ICE BANK CONTROL ITEM 1 RED WIRE ITEM 9 BLACK WIRE ITEM 8 FIGURE 2 ICE BANK CONTROL O RING ITEM 7 O RING ITEM 7 ICE BANK CONTROL BULB CAPILLARY TUBE TO ICE BANK CONTROL ICE BANK CONTROL BULB HOLDER ITEM 6 ...

Страница 5: ...5 569000264 FIGURE 3 UNIT TOP VIEW ICE BANK CONTROL ASSEMBLY ITEMS 1 AND 2 AGITATOR MOTOR BRACKET UNIT WIRING HARNESS HAZARD SHOCK LABEL ITEM 4 CAPILLARY TUBE SNAP BUSHING ITEM 11 GROMMET ITEM 3 ...

Страница 6: ......

Страница 7: ...6 569000264 ICE BANK CONTROL BULB FIGURE 4 UNIT WIRING DIAGRAM ...

Отзывы: