![Cornelius IDC 2XX Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/cornelius/idc-2xx/idc-2xx_operators-manual_2668200010.webp)
IDC Operator’s Manual
© 2005-2010, IMI Cornelius Inc.
- 7 -
Publication Number: 621057403OPR
Replenishing CO
2
Supply (As Required)
NOTE:When indicator on the 1800-psi gage is in the shaded (“change CO
2
cylinder”) portion of the dial,
CO
2
cylinder is almost empty and should be changed.
1. Fully close (clockwise) the
CO
2
cylinder valve.
2. Slowly loosen the CO
2
regulator assembly coupling nut allowing CO
2
pressure to escape, then remove
the regulator assembly from the empty CO
2
cylinder
.
3. Unfasten safety chain and remove the empty CO
2
cylinder.
!
WARNING:
To avoid personnel injury and/or property damage, always secure the CO
2
cylinder with a safety chain to
prevent it from falling over. Should the valve become accidently damaged or broken off, a CO
2
regulator
can cause serious personnel injury or death could occur.
4. Position the full CO
2
cylinder and secure with a safety chain.
5. Make sure gasket is in place inside the CO
2
regulator assembly coupling nut, then install the regulator
assembly on the CO
2
cylinder.
6. Open (counterclockwise) the CO
2
cylinder valve slightly to allow the lines to slowly fill with gas, then open
the valve fully to back-seat the valve (back-seating the valve prevents gas leakage around the valve
shaft).
Check CO
2
connections for leaks. Tighten any loose connections.
Содержание IDC 2XX
Страница 11: ......
Страница 12: ...IMI Cornelius Inc www cornelius com...