Installation and service manual: Postmix tower
Ribbon
65
Cornelius Deutschland GmbH
Document no. TD0000100
Version: 06/11/2017, Index 0
The System will reboot, and the start screen will appear on the
touchscreen.
Depending on the setting, the commissioning configuration
may have to be confirmed;
.
5.
Check the configuration in the “Date & Time Setting”
menu; see the document
“Tower operator manual”, doc-
ument no. TD0000000
.
6.
Check the settings in the “Wifi” menu;
7.
Check the settings in the “Critica_Aws” menu;
.
After the update is complete, the “Update Schedule” application will be initiated.
8.2.4
Calling up the “Update Schedule” menu
In the “Update Schedule” menu, you can see when which update is to be carried out and when.
Settings can be made via the update package created. No further settings are required.
8.2.5
Checking settings in the “Status” menu
1.
Check the status; see the document
“Tower operator manual”, document no.
TD0000000
.
2.
Return to the service menu by pressing the “Exit” button
and then continue with the next step
Figure 87
Figure 88