![Cornelius 221000414x Скачать руководство пользователя страница 68](http://html1.mh-extra.com/html/cornelius/221000414x/221000414x_installation-and-service-manual_2667698068.webp)
Installation and service manual: Postmix tower
Ribbon
66
Cornelius Deutschland GmbH
Document no. TD0000100
Version: 06/11/2017, Index 0
8.2.6
Calling up the “SANITIZATION” menu
Both the unit and the tubes can be cleaned via the “SANITIZATION” menu. The cleaning pro-
cess is performed in 4 steps.
1.
Call up the “VMC Settings” menu (virtual machine control settings); see the document
“Tower operator manual”, document no. TD0000000
.
2.
Press “SANITIZATION”.
3.
Continue cleaning all tubes and valves,
.
8.2.7
Checking and configuring settings in the “Brix Set Up”
menu
The valve assignment can be checked and configured in the “Brix Set Up” menu.
1.
Call up the “VMC Settings” menu (virtual machine control settings); see the document
“Tower operator manual”, document no. TD0000000
.
2.
Check the setting for each valve.
3.
If the settings are correct, return to the service menu and continue with the next step,
.
4.
If the settings are not correct, proceed as follows:
Notice!
Settings are made by means of relevant updates and should only be made
in exceptional cases.
Figure 89