![Core Health & Fitness Throwdown HIIT4 Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/core-health-and-fitness/throwdown-hiit4/throwdown-hiit4_owners-manual_2667001016.webp)
Page 15
31.
Attach eight (8) storage pins to the 6 foot
XTC cross member using 16 (sixteen) M6
x 8mm button head cap screws.
Fig. 27
32.
Install the XTC cross member assembly
built in Step 31 between posts
–
using three (3) short bolt assemblies.
33.
Finish securing the 4 foot shelves from
Step 30 to post
using four (4) short
bolt assemblies.
34.
Repeat steps 29-33 in reverse to install
the shelves for posts
,
,
, and
.
13
15
14
Fig. 28
35.
At this point the HIIT 4 will need to be anchored to the floor:
a. All equipment must be bolted down prior to use by a licensed contractor.
b. Equipment that Is not securely bolted to the floor is not safe.
c. The customer is responsible for determining the suitability of the installations site.
d. Factors such as equipment weight, vibration, overhead clearance, workout activities should be con-
sidered.
e. When the floor is constructed of concrete, the concrete should have a rated strength of at least
4000psi.
f. The anchors should be installed in accordance with the anchor manufacturer’s recommendations.
g. It is the responsibility of the gym owner to ensure that the sub-floor and installation anchors are ap-
propriate for the equipment.
Содержание Throwdown HIIT4
Страница 1: ...OWNER S MANUAL CORE HEALTH FITNESS HIIT4...
Страница 22: ...Page 21 THIS PAGE INTENTIONALLY BLANK...
Страница 23: ...Page 22 THIS PAGE INTENTIONALLY BLANK...