5
8
Check the door frame is vertical and is centrally positioned between the wall channels.
From inside the enclosure, in the 6 positions shown, drill through the wall channels into the fixed panels.
Important: The top holes MUST be 18mm down from the top.
Drill using a 3mm drill bit.
Fix using 6 x 10mm screws and screw caps.
From inside
10mm
9
a:
Attach 2 x glass clamps to each of the horizontal rails (at edge of glass) using 10mm screws,
tighten by hand only - do not
overtighten.
Push fit glass clamp covers.
b:
Select the short vertical seals (PN40350), fit the seals to both fixed panels.
Important:
Seals must sit tight against glass clamps (top and bottom).
Important:
Seal 'flippers' must be on inside of the enclosure.
Note:
Wetting the glass with water will help fit the seals.
Inside of
fixed panel
PN50490
ø 3
mm
18mm
PN50488
10mm
Inside of
fixed panel
a
b
PN40350