Installing the LCR 6200
Complete the following steps to install an LCR 6200:
1. Mount the LCR 6200 at the desired location,
which is preferably a flat, non-vibrating
surface.
The LCR enclosure has two pre-drilled mounting
tabs. Cooper Power Systems recommends pan
head screws up to 1/4” in size for mounting the
LCR. The distance between the mounting holes is
8.25 inches, and the diameter of the mounting
holes is 0.3125 inches.
For a rain-tight rating, mount the LCR so that the
“This Way Up” arrow on the label points up.
2. Remove electrical power from the AC circuits
that are to supply power to the LCR and the
load to be controlled.
3. Wire the LCR 6200 according to the wiring
diagram located on the LCR cover.
Install the wiring within a 1/2” liquid-tight, non-
metallic, flexible conduit or make sure the wiring is
close nippled into an approved junction box or
wiring compartment.
All wiring connections are made to factory-
installed leads that are rated for 600 VAC, 105° C.
No polarity requirements apply to the output
leads.
4. Locate and record the LCR address, Install
Code, EUI-64 address, and any other
necessary information.
5. Apply electrical power to the LCR.
6. Commission the ZigBee module by
performing the steps described in
“Commissioning the ZigBee Module” on
page 4
.
7. If desired, perform a test shed as described in
the section
“Test Button” on page 5
.
8. Close the LCR door, secure the latch, and
install a utility seal.
WARNING:
Dangerous voltages are present.
Multiple disconnects may be required to
de-energize all circuits.
AVERTISSEMENT:
Présence de tensions
dangereuses. Il pourrait être nécessaire de
procéder à des débranchements multiples pour
mettre tous les circuits hors tension.