8
14.50"
15.25"
9.25"
11.00"
SURFACE
MOUNT
HOLES (4)
FLUSH
MOUNT
HOLES (8)
1/4"x1/2"
DOUBLE KNOCKOUT (3)
TOP, BOTTOM, AND BACK
1/2"/3/4"
TERMINAL BLOCK
MOUNTING STUDS
#8-32
Figure 3. Mounting Holes for Mounting the Backbox, Flush and Surface
3. Connect conduit fittings to the desired cable knockouts, and run the appropriate
pushbutton and SPRM wiring into the backbox.
If the optional HVAC pushbutton is installed, run the HVAC wiring through a separate
conduit away from the push button and remote microphone wiring. This will prevent
electrical interference and false troubles from appearing on the SP40S.
NOTE:
If the SP4-LOC is being flush mounted and finish work on the location has to be
completed, stop here and complete the work before connecting and mounting the
inner and outer doors.
Содержание SAFEPATH4 SP4-LOC
Страница 2: ...2...