Cooper Power Systems VXE Control Скачать руководство пользователя страница 6

Electronic Control

The electronic circuits for programming the operating
sequence, minimum-trip levels, time–current characteris-
tics, and other parameters are located in a separate pad-
lockable cabinet that can be mounted at any convenient
accessible location, near or remote from the recloser.

No external power source is required to operate the elec-
tronics. Power is obtained from the line by means of a
1000:1 bushing current transformer mounted in the head
of the recloser. A minimum of 3 A of primary current flow
is sufficient to power the sensing circuits and charge the
trip capacitors which actuate the low-energy actuator. A 9 V,
1.4 Ah lithium battery is provided to supply energy to
actuate the closing contactor. And, in the event that cur-
rent drops below 3 A, the battery will ensure proper con-
trol operation.

Electronic control circuitry is centralized on a single print-
ed circuit board which is easily replaceable. DIP switch
programmable control parameters, along with easily
replaceable TCC cards, increase application flexibility.
Refer to the 

Control Programming and Operation 

section

of this manual for further information.

The VXE control can be equipped with an optional SCADA
input/output board to provide remote operation and status
functions for SCADA applications. Refer to the 

Accessories

section of this manual for additional information.

Recloser Data Plates

Check the recloser data plates (Figure 3), which are
located on the sleet hood, to make sure the closing coil
voltage, the voltage, and the current ratings are compat-
ible with the system on which the recloser is to be
installed.

Type VXE Single-Phase Electronically Controlled Recloser Installation and Operation Instructions

6

WARNING: 

Hazardous voltage. Closing coil volt-

age and current ratings must be compatible with

the system application. Refer to the data plates, located
on the sleethood of the recloser, for specific rating infor-
mation. Failure to comply can result in death, severe
personal injury, and equipment damage.

G129.0

!

Figure 3.
Recloser data plates are located on sleet hood.

921122KM

CAUTION: 

Fire. Explosion. Leakage. Severe

burn hazard. Do not recharge or disassemble bat-

tery. Battery should not be exposed to temperatures
above 175°F. Do not incinerate or expose the battery
contents to water. Failure to comply can result in equip-
ment damage and serious personal injury.

T251.1

!

Содержание VXE Control

Страница 1: ...rogramming and Operation 7 Type VXE Electronic Control 7 Programming the Control Settings 8 Specifications and Ratings 10 Dimensions 11 Installation Procedure 12 Placing the Recloser In Service 13 Ope...

Страница 2: ...ting main taining or testing this equipment carefully read and understand the contents of this manual Improper operation handling or maintenance can result in death severe personal injury and equipmen...

Страница 3: ...ss is discov ered file a claim with the carrier immediately Check for oil leakage and tighten all bolts that may have loosened during shipment especially the tank mounting bolts Tank mounting bolts sh...

Страница 4: ...voltage closing is sup plied through a 2 pin connector mounted on the recloser head Closing Solenoid Operation The closing operation is illustrated by considering the recloser to be connected to the l...

Страница 5: ...ion the lever is pulled from under the sleet hood to its down position as shown in Figure 2 The lever must be manually returned to the up position in order to return the recloser to its pre programmed...

Страница 6: ...eration section of this manual for further information The VXE control can be equipped with an optional SCADA input output board to provide remote operation and status functions for SCADA applications...

Страница 7: ...pening actuator In addition a control battery is required to supply power to the control during the reclose intevals If line current drops below 3 A or the recloser is in the open position power is th...

Страница 8: ...le protecting fuses from tem porary faults Sequence Coordination is always active for the number of TCC1 operations selected for the VXE control For example for two trip operations on TCC1 and two tri...

Страница 9: ...TCC2 Time Current Curve Modifiers The DIP switches labeled S6 Figure 5 are used to mod ify the shape of the time current curve produced by the TCC plug in card for TCC1 and or TCC2 Each TCC plug in ca...

Страница 10: ...imate inches 0 4 0 5 Contact Close Time Close Signal To Contact Make seconds 0 19 0 24 Open Contact Travel Time Open Signal To Contact Part seconds 0 014 0 022 Interrupting Time Open Signal to Arc Ext...

Страница 11: ...Pole Bolt Connector NO 6 350 MCM 16 UNC 2B 8 5 Figure 6 Dimensions of Types VXE15 and VXE27 reclosers Type Bushing Type A B C VXE15 standard 1156 45 5 483 19 270 10 5 VXE15 extra creepage 1237 48 75 5...

Страница 12: ...ug as shown in Figure 4 Make sure that all DIP switch settings are set correctly and that the control cable is connected between the recloser and control 6 Mount the recloser Use the lifting lug locat...

Страница 13: ...en placing the recloser in service Be sure that the control battery is properly connected When the recloser is connected and source side high voltage lines are energized by closing the source side dis...

Страница 14: ...dle down and returning the yellow handle to its up Closed position If the VXE con trol is equipped with the optional SCADA input output accessory board the recloser can be remotely closed from lockout...

Страница 15: ...n the 600 5 tap 3 Ammeter Must have a rating based on the level of test current Since the control is responsive to peak current it is recommended that metering responsive to peak current be used when...

Страница 16: ...the pipe plug in the head casting before placing the recloser in service High Potential Insulation Level Withstand Tests High potential withstand tests provide information on the dielectric condition...

Страница 17: ...when the recloser trips and compare to the VXE control s pro grammed minimum trip value Sequence of Operation Test The operating sequence can be checked by using the manual closing tool to close the r...

Страница 18: ...ating correct operation of the clos ing solenoid Type VXE Single Phase Electronically Controlled Recloser Installation and Operation Instructions 18 Figure 13 Suggested test diagram for high voltage c...

Страница 19: ...SCADA I O board also includes dry contacts to provide remote status information All remote features are accessed through a 19 pin recep tacle Type MS 22 14 female mounted on the bottom of the control...

Страница 20: ...Department offers recloser mainte nance training classes These classes taught by experi enced service technicians are held at the factory s in house training facility For additional information contac...

Отзывы: