background image

 

 

 

Initial Set Up

 

Step by step Guide 
 

Once the Water Witch has been mounted properly, 
TESTING OF THE WATER WITCH is required.  To ensure 
that the sensor and solenoid are working properly, 
please complete the following steps: 
 
Step 1

:  Ensure the pool is filled to the operating water 

level required. 

Step 2

:  Connect the sensor and solenoid plugs to the 

control box ensuring that the plugs are 
connected as indicated on the label on the 
control box (

sensor left

; solenoid right). 

Step 3

:  Turn power and water supplies on.  The ON light 

will automatically come on and begin to flash.  
Depending on what position the sensor is in, will 
determine if the sense light is on and flashing or 
the fill light is on. 

Step 4

:  Holding the sensor upside down, check that the 

ON & SENSE lights are flashing approximately 
every two seconds. 

Step 5

:  Turn the sensor the right way up and the ON 

light will continue to flash and the FILL light will 
come on.  This will turn the water on to fill the 
pool. 

IF THE WATER DOES COME ON, YOU HAVE CORRECTLY 
INSTALLED THE WATER WITCH SYSTEM

.   

 

PLEASE FOLLOW STEPS 6 TO 9 TO 

SET THE SENSOR

.   

Содержание Water Witch

Страница 1: ...t Up Set Up Set Up Set Up Guide Guide Guide Guide utomated utomated utomated utomated p p p pool and ool and ool and ool and s s s spa water level pa water level pa water level pa water leveli i i ing...

Страница 2: ...ng of water witch Page 7 Setting the sensor Page 8 Operating Mode Dip Switch Settings Page 9 Internal Block Diagram Of control Back Page Contact Information Danger This unit is powered by a 240Volt AC...

Страница 3: ...ow that controls the flow of water Leveling Sensor Our patented leveling sensor designed to fit into 40mm and 50mm Class 9 pipe NOTE The sensor will not fit into 40mm Class 12 pipe When light is on st...

Страница 4: ...Diagram 3 Diagrams 3 4 5 and 6 Diagram 5 Diagram 6 Diagram 4 2...

Страница 5: ...sing the flow direction arrow indicated on the solenoid body Sensor Refer to the diagrams 5 6 on the opposite page for mounting of the sensor The suggested method of plumbing is two 40mm class 9PVC pi...

Страница 6: ...ct your distributor as 20 30 meter cables are available Custom made longer lengths can be manufactured Sensor Solenoid Connections TX GRD RX Sol1 Sol2 Cable Colour Code Reference Diagram7 Sensor Plug...

Страница 7: ...nd solenoid leads are normally 5 meters long with plugs attached for connections to the base of the control box as shown in Diagram 7 Water Witch 20 30 for the balance tank installs come with a 20 or...

Страница 8: ...or left solenoid right Step 3 Turn power and water supplies on The ON light will automatically come on and begin to flash Depending on what position the sensor is in will determine if the sense light...

Страница 9: ...ing up or down in the pipe Step 8 As an indicator for the position of the sensor in the pipe mark the sensor lead with a pen marker to indicate how far the sensor has been lowered into the pipe Step 9...

Страница 10: ...wer lead and switch on the power The Water Witch is now set to the correct water level and mode settings TABLE ONE Dip Switch Positions relevant to pool size 8 Mode Description Capacity In LTRS SWITCH...

Страница 11: ...Transformer Internal Of Control B Chip Dip switch Internal block Diagram Of Control Box Dip switch block Diagram 9...

Страница 12: ...ve any questions or you have come across a problem please call us on 1300 652 076 or 03 5023 3722 or you can refer to our web site for trouble shooting and technical help www cookeindustries com au Th...

Отзывы: