November 8 2019 | 291180-ENG R00 19
4
START UP
Once the chamber is assembled, leveled, and all connections have been made, turn on the
power. Ensure that the cabinet is operating properly before introducing any research material.
4.1 Power ON
4.1.1 Start-Up Procedure
1.
Ensure the mains breaker is ON.
2.
Ensure the power cord is plugged into a receptacle on a dedicated circuit.
3.
Ensure that all drain and water lines are connected.
4.
For a water-cooled condensing unit, open the manual bypass valve for constant flow
supply, close the bypass valve for variable flow supply, or adjust the bypass valve as
required during water system balancing.
5.
Turn the power switch on the front of chamber to ON.
6.
With the control system powered up, set and run a program. Refer to the supplied
control system manual for further details.
Before powering ON, ensure all mechanical, fluid, and electrical connections are
secure.
Before powering ON, ensure all local, municipal, and facility inspections are complete.
Before powering ON, ensure that no service or other personnel are performing work
on the cabinet.
Ensure the chamber is level and stable before operating.
Do not turn the control system off during boot up.
Содержание GEN1000-GE
Страница 1: ...GEN1000 GE OPERATOR MANUAL 291180 ENG R00...
Страница 12: ...GEN1000 GE Operator Manual 4 November 8 2019 291180 ENG R00...
Страница 16: ...GEN1000 GE Operator Manual 8 November 8 2019 291180 ENG R00...
Страница 26: ...GEN1000 GE Operator Manual 18 November 8 2019 291180 ENG R00...
Страница 34: ...GEN1000 GE Operator Manual 26 November 8 2019 291180 ENG R00...
Страница 46: ...GEN1000 GE Operator Manual 38 November 8 2019 291180 ENG R00...
Страница 53: ......