Contura C 26K Low Скачать руководство пользователя страница 3

GB

67

List of Contents 

Technical details 

 

68

Supply of combustion air 

 

69

Connection to chimney 

 

70

Installation distances 

 

71

Installation of C26K Low 

 

72

Final installation and joining 

 

78

A warm welcome to Contura.

A warm welcome to the Contura family. We hope you 
will get a great deal of pleasure from your new stove. 
As a new owner of a Contura stove, you have secured 
a product with timeless design and long service life. 
Contura also has a combustion process that is both 
environmentally friendly and efficient, for the best heat 
production.

Read through these installation instructions carefully 
before installation. Read how to best light your stove 
in the lighting instructions.

The stove becomes very hot

During operation, certain surfaces of the stove become 
very hot and can cause burn injuries if touched. Also, take 
heed of the strong heat radiated through the door glass. 
Placing flammable material closer than the safe distance 
indicated may cause a fire. Smoulder combustion can cause 
quick gas ignition with the risk of damage to property and 
personal injury. 

NOTE! 

WARNING!   

Report the installation of a stove to your 
local authority.

The owner of the house is personally responsible 
for ensuring compliance with the mandatory safety 
requirements and must have the installation approved by 
a qualified inspector. Your local chimney sweep must also 
be informed about the installation, as this will affect the 
routines for regular chimney-sweeping services.

CONTENTS

Содержание C 26K Low

Страница 1: ...Installation instructions C 26K Low www contura eu...

Страница 2: ...CLARED PERFORMANCE Essential characteristics Performance Harmonised technical specification Reaction to fire A1 WT Minimum distance to combustible material 100 mm to rear 600 mm to side Other safety d...

Страница 3: ...light your stove in the lighting instructions The stove becomes very hot During operation certain surfaces of the stove become very hot and can cause burn injuries if touched Also take heed of the str...

Страница 4: ...house if the total weight does not exceed 400 kg Hearth plate Due to the risk of embers falling out a flammable floor must be protected by a hearth plate It must extend 300 mm in front of the stove a...

Страница 5: ...utside that is connected to the connector on the underneath of the stove The amount of air needed for combustion is approx 25m3 h The connector has an external diameter of 67 mm When installing ducts...

Страница 6: ...at least 12 Pa The draft is affected both by the length and area of the chimney and by how well sealed it is The minimum recommended chimney length is 3 5 m and suitable cross sectional area is 150 20...

Страница 7: ...inlet connector 410 mm G distance to hole in guide plate 288 100 600 890 500 400 300 200 300 400 500 200 Combustible wall Permitted area for combustible material 435 120 8 9 0 810 Combustible wall 238...

Страница 8: ...o the courses do not end up uneven and crooked Otherwise this can result in abnormally large gaps and uneven lines During assembly check that all tiles stand horizontally and that all parts in a cours...

Страница 9: ...GB 73 5 mm Place the profile edge to edge with the tile s side 1 0 1 0 V A N A D I U M N o 7 C H R O M E 1 0 1 0 V A N A D I U M N o 7 C H R O M E ASSEMBLY...

Страница 10: ...CHROME 10 10 VA NA DIU M No 7 C H R O M E Wait to tighten this screw until the next tile is in place When installing the upper course Wait to tighten the screws in the tile until all parts are in plac...

Страница 11: ...B 75 10 10 VANADIU M No 7 CHR OME 10 10 VANA DIUM No 7 CHROME ASSEMBLY Prevent the side panels from dipping forward by hooking the hooks in the rear profile and tightening the screws until they engage...

Страница 12: ...moved up slightly by hooking the hooks in the rear profile and tightening the screws Tighten the screws until the upper plates align with the upper edge 10 10 VANADIU M No 7 CHROME 10 10 VAN AD IUM N...

Страница 13: ...GB 77 ASSEMBLY...

Страница 14: ...the guide plate to support the top plates Adjust them so they are at the same height as the top of the side plates Open and fold out any deformed edges in the pipe opening to facilitate installation...

Страница 15: ...s After the sealant has dried the tiles can be wiped clean Ensure that joints are clean and dry before applying the sealant Final inspection of the installation It is extremely important that the inst...

Страница 16: ...E AB Box 134 SE 285 23 Markaryd Sweden www contura se Contura reserves the right to change dimensions and procedures described in these instructions at any time without special notice The current edit...

Отзывы: