GB
74
ASSEMBLY
10
VANADIUM
No. 7
CHROME
VANAD
IUM
CHROM
E
Wait to tighten this screw until the next tile is in place.
When installing the upper course:
Wait to tighten the screws in the tile until all parts are in place and all adjustments have been made.
Страница 1: ...Installation instructions C 26K Low www contura eu...
Страница 2: ...CLARED PERFORMANCE Essential characteristics Performance Harmonised technical specification Reaction to fire A1 WT Minimum distance to combustible material 100 mm to rear 600 mm to side Other safety d...
Страница 3: ...light your stove in the lighting instructions The stove becomes very hot During operation certain surfaces of the stove become very hot and can cause burn injuries if touched Also take heed of the str...
Страница 4: ...house if the total weight does not exceed 400 kg Hearth plate Due to the risk of embers falling out a flammable floor must be protected by a hearth plate It must extend 300 mm in front of the stove a...
Страница 5: ...utside that is connected to the connector on the underneath of the stove The amount of air needed for combustion is approx 25m3 h The connector has an external diameter of 67 mm When installing ducts...
Страница 6: ...at least 12 Pa The draft is affected both by the length and area of the chimney and by how well sealed it is The minimum recommended chimney length is 3 5 m and suitable cross sectional area is 150 20...
Страница 7: ...inlet connector 410 mm G distance to hole in guide plate 288 100 600 890 500 400 300 200 300 400 500 200 Combustible wall Permitted area for combustible material 435 120 8 9 0 810 Combustible wall 238...
Страница 8: ...o the courses do not end up uneven and crooked Otherwise this can result in abnormally large gaps and uneven lines During assembly check that all tiles stand horizontally and that all parts in a cours...
Страница 9: ...GB 73 5 mm Place the profile edge to edge with the tile s side 1 0 1 0 V A N A D I U M N o 7 C H R O M E 1 0 1 0 V A N A D I U M N o 7 C H R O M E ASSEMBLY...
Страница 10: ...CHROME 10 10 VA NA DIU M No 7 C H R O M E Wait to tighten this screw until the next tile is in place When installing the upper course Wait to tighten the screws in the tile until all parts are in plac...
Страница 11: ...B 75 10 10 VANADIU M No 7 CHR OME 10 10 VANA DIUM No 7 CHROME ASSEMBLY Prevent the side panels from dipping forward by hooking the hooks in the rear profile and tightening the screws until they engage...
Страница 12: ...moved up slightly by hooking the hooks in the rear profile and tightening the screws Tighten the screws until the upper plates align with the upper edge 10 10 VANADIU M No 7 CHROME 10 10 VAN AD IUM N...
Страница 13: ...GB 77 ASSEMBLY...
Страница 14: ...the guide plate to support the top plates Adjust them so they are at the same height as the top of the side plates Open and fold out any deformed edges in the pipe opening to facilitate installation...
Страница 15: ...s After the sealant has dried the tiles can be wiped clean Ensure that joints are clean and dry before applying the sealant Final inspection of the installation It is extremely important that the inst...
Страница 16: ...E AB Box 134 SE 285 23 Markaryd Sweden www contura se Contura reserves the right to change dimensions and procedures described in these instructions at any time without special notice The current edit...