38
10) Install the coffee group in the machine.
11) Before switching on the machine don’t forget to bleed the coffee boilers.
12) Warm the coffee group for 15 minutes, then shut off the machine and wait 30 minutes.
13) After 30 minutes, tighten again the 3 cap nuts with the torque wrench (1.5 Nm).
The procedure is completed, the Twin Star 2 is ready to use.
Once a year, tighten the 3 cap nuts again.
Содержание TWIN STAR 2 R-EV 2G
Страница 2: ......
Страница 43: ...41 10 DIMENSIONS ...
Страница 53: ...51 13 HYDRAULIC DRAWING Σ Σ ...
Страница 55: ......