![Conlog BEC23 Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/conlog/bec23/bec23_technical-manual_2652576002.webp)
2
BEC23 Technical Manual
Table of Contents
Section 1 : Company Overview............................................................4
Section 2 : Introduction .......................................................................5
Section 3 : Standards ..........................................................................6
Section 4 : Specifications .....................................................................6
Section 5 : Features ............................................................................7
Protection ......................................................................................... 7
Security ............................................................................................ 7
Reliability.......................................................................................... 7
Section 6 : Meter Overview..................................................................8
Disconnection Device........................................................................ 9
Latch type meter (BEC23PL)................................................................................ 9
Circuit Breaker type meter (BEC23PD) ................................................................ 9
Earth Leakage type meter (BEC23PE).................................................................. 9
Rate LED........................................................................................... 9
Meter serial number........................................................................ 10
User interface ................................................................................. 10
Meter interface................................................................................................. 10
LCD interface ................................................................................. 10
LCD Icon Display ............................................................................................. 11
Overload Indication ......................................................................................... 11
Low Credit Indication ....................................................................................... 11
Zero Credit Indication ...................................................................................... 11
Wait (Clock) Indication ..................................................................................... 11
Negative Credit Indication................................................................................ 11
Token Acceptance Indication ............................................................................ 12
Token Rejection Indication................................................................................ 12
Tamper Indication............................................................................................ 13
Section 7 : Special User Functions ......................................................14
Meter Status.................................................................................... 16
Tamper detection flag ...................................................................................... 16
Meter commissioning flag ................................................................................ 16
Section 8 : Engineering Tokens ..........................................................17
Maximum Load Limit token (Meter Specific) ..................................... 17
Clear Credit token (Meter Specific) .................................................. 17
Key Change token (Meter Specific) .................................................. 17
Clear Tamper token (Meter Specific)................................................ 18
Commissioning token (Non-Meter Specific)...................................... 18
Meter Test token (Non-Meter Specific).............................................. 19
Section 9 : Installation of the meter ....................................................20
Installing the wall base.................................................................... 20
Wiring up the wall base .................................................................. 20
Testing the meter installation and sealing the unit ............................ 21
Removing the meter ........................................................................ 21
Section 10 : Using a BEC23 Electricity Meter .......................................22
Section 11 : Problem Solving .............................................................23