Conlog BEC23 Скачать руководство пользователя страница 15

 

 

 

BEC23 Technical Manual

 

15

 

 

 

   

 

Display Supply Group Code (SGC)

 

The  SGC  is  programmed  into  the  meter  at  the  time  of 

manufacture. The example shows a SGC of 399999.  
 
When  a  key  change  has  been  performed  this  value  is 
cleared  to  zero.    It  should  be  noted  that  the  key  change 

tokens  do  not  contain  any  information  pertaining  to  the 
SGC  number,  therefore  the  SGC  register  cannot  be 
updated.

 

 

 

 

 

 

 

To 

 

 

 

 

Last 10 STS Token 20-Digit Numbers 

The most recent token entered can be selected by the hash 
key 11, the  second  most recent  token by the  hash key 12 
and so on. The actual 20 digit token is displayed as read, 

from left to right. 

 

 

 

 

 

 

 

To 

 

 

 

 

Last 10 STS Token Transfer Amounts in kWh 

If the information contained within the token is not a kWh 
value,  then  the  class  and  sub-class  of  the  token  is 
displayed.  The only token carrying kWh information is the 
credit.    Both  the  power  overload  setting  and  Phase 

Imbalance tokens have a value depicted as kW. 
The  graphic  on  the  top graphic  shows  an  example  where 
the  token  does  not  contain  a  numeric  kWh  value;  it  is  a 
clear credit token. 
The  graphic  below  shows  an  example  where  the  token 

does  contain  a  numeric  kWh  value;  it’s  a  credit  token  of 
726.04kWh. No Class or Sub-Class is shown.

 

 

 

 

 
 
 
 
 

 
 
 
 
 

 

 
 

 

Содержание BEC23

Страница 1: ...ubject to change without notice and does not represent a commitment on the part of Merlin Gerin SA Pty Ltd t a Conlog No part of this document may be reproduced transmitted transcribed or translated i...

Страница 2: ...k Indication 11 Negative Credit Indication 11 Token Acceptance Indication 12 Token Rejection Indication 12 Tamper Indication 13 Section 7 Special User Functions 14 Meter Status 16 Tamper detection fla...

Страница 3: ...d token 23 Used Duplicate token 23 Expired token 24 Meter Full 24 Meter Problems 25 Error Codes on Meters 26 Section 12 Typical Installation 27 Section 13 Glossary Of Terms 28 Section 14 Technical Spe...

Страница 4: ...mpany currently has prepayment projects operating in more than 20 countries with an ever increasing footprint that encompasses Africa Eastern Europe South America and South East Asia In addition as a...

Страница 5: ...base The data is entered by means of a keypad and the internal disconnection switch is rated to 100A It also has a tamper switch to detect tampering on the meter BEC23PD T This is a STS single phase...

Страница 6: ...repayment meters ISO 14001 2004 Environmental management systems ISO 9001 2000 Quality management systems Requirements with guidance for use ESKOM SCSSCAAA9 Particular Requirements for Pre payment Met...

Страница 7: ...curity Provision for lead seals or wire seals are made The installation is completely sealed to prevent tampering and insect ingress Internal register of correctly entered tokens Each meter has a uniq...

Страница 8: ...l Section 6 Meter Overview BEC23PL BEC23PE Keypad Rate LED LCD Display Circuit Breaker Reset Switch Meter Serial Number Security Seals Keypad Rate LED LCD Display Meter Serial Number Security Seals Ea...

Страница 9: ...e type meter BEC23PE The meter uses one 20A double pole circuit breaker as the disconnection device on a single phase meter The circuit breaker disconnects the consumer when the credit expires the loa...

Страница 10: ...ter Interrogator Kit LCD interface The meters LCD interface has been standardised throughout the range of Conlog electricity meters The LCD display indicates credit available in kWh load indicator ove...

Страница 11: ...credit goes above the threshold will the icon go off Zero Credit Indication When the available credit reaches zero the disconnect device disconnects the load When the credit is zero the icon remains o...

Страница 12: ...on for displaying the value shall be 10 seconds thereafter reverting to its default display The is illuminated at the start of the message display and remains active for a period of four seconds befor...

Страница 13: ...he tamper detection If configured to display the tamper status then the Light Bulb icon will be displayed as indicated in the graphic on the following page To clear the tamper condition a clear tamper...

Страница 14: ...e keys will test the keypad The display will fill with characters relative to the key being tested The example shows the key having been pressed Type and the segment display test will be invoked Once...

Страница 15: ...recent token by the hash key 12 and so on The actual 20 digit token is displayed as read from left to right To Last 10 STS Token Transfer Amounts in kWh If the information contained within the token...

Страница 16: ...e below indicates a meter that has been commissioned and is not in tamper Tamper detection flag When this flag is clear the meter has not detected a tamper condition When set the meter has detected a...

Страница 17: ...l consumption to date register This token is meter specific and may only be used once Key Change token Meter Specific This token is used to replace the existing key with a new one i e when changing th...

Страница 18: ...ecific token 1275 4194 1448 6450 5970 The meter can be configured with or without commissioning If configured the meter is supplied with the disconnection device open and the tamper detection circuitr...

Страница 19: ...t be shown so it will jump from Step 9 to Step 11 The 20 Digit number is 5649 3153 7254 5031 3471 Step 1 Step 2 Step 3 Open contactor trip breaker if there is credit in the meter Perform LCD display t...

Страница 20: ...ng Government standards and safety regulations 1 Wire the wall base using cable glands appropriate for the installation 2 Connect the incoming supply to the top set of terminals above the horizontal p...

Страница 21: ...te If you perform the STS0 meter test and the meter trips and goes dead it means that you have swapped the line and load wiring Remove the meter and correct the wiring If the meter is dead when you pu...

Страница 22: ...ared If it is necessary to start from the beginning again press the key This will clear all the numbers entered so far and allow the re entry of the numbers STEP 3 After entry of the 20 digit number t...

Страница 23: ...oken was entered into the meter incorrectly The key revision number of the token differs to the key revision number as programmed into the meter The meter might be in a tamper status The commissioning...

Страница 24: ...fault meter display This token can be thrown away Meter Full In the situation where the credit being entered would take the credit remaining over the limit of the meter the meter will display the FULL...

Страница 25: ...t the meter has been set not to display negative credit at the factory Question What happens when the icon appear on the display Answer When the icon is on the display it means the meter is processing...

Страница 26: ...meter and the meter would normally have to be returned to the factory in Durban for corrective action An example of the actual screen error is shown below the table Error Code on Display Corrective Ac...

Страница 27: ...right that comes pre wired with a common base earth leakage a light and three plug points As can be seen from the diagram below this is what a typical BEC23PE 20 Amps installation looks like The meter...

Страница 28: ...lectrical shock in the event of a fault current A fault current is seen as a current exceeding 30mAmps flowing between the Live connection and the Earth connection Engineering Tokens These are special...

Страница 29: ...TS meters are characterised by an 11 digit serial number This number the swipe card or an old token is required when purchasing tokens Meter Specific Refers to a token that will only work in the meter...

Страница 30: ...nd encoded on the magnetic stripe together with the Supply Group Code and meter tariff index T Tamper Refers to the illegal opening or modifications of a meter If a meter is fitted with a tamper devic...

Страница 31: ...idity 95 non condensing Degree of protection IP51 Customer Displayed Information Status of incoming supply Available credit Disconnection status BEC23PL Low credit warning Token accept reject Consumpt...

Страница 32: ...ical Manual Standards IEC 62052 11 IEC 62053 21 IEC 62055 41 IEC 60068 2 27 IEC 60068 2 6 IEC 62056 21 SANS 1524 1 ISO 14001 2004 ISO 9001 2000 ESKOM SCSSCAAA9 ESKOM TRMSCAAP2 SANS 767 1 BEC23PE T VC...

Страница 33: ...ion 15 Contact Information Physical 270 Brickfield Road Durban 4001 KwaZulu Natal South Africa Post P O Box 2332 Durban 4000 South Africa Tel 27 31 268 1111 Fax 27 31 268 1500 Email corporate conlog c...