GPIOs
The conga-TS370 offers General Purpose Input/Output signals on the A–B connector. The GPIO signals are controlled by the congatec Board
controller.
6.1.12
Power Control
PWR_OK
Power OK from main power supply or carrier board voltage regulator circuitry. A high value indicates that the power is good and the module
can start its onboard power sequencing.
Carrier board hardware must drive this signal low until all power rails and clocks are stable. Releasing PWR_OK too early or not driving it low
at all can cause numerous boot up problems. It is a good design practice to delay the PWR_OK signal a little (typically 100ms) after all carrier
board power rails are up, to ensure a stable system.
A sample screenshot is shown below:
Note
The module is kept in reset as long as the PWR_OK is driven by carrier board hardware.