6.
Transport
ATTENTION!
The lifting unit must not be thrown or dropped during transport or installation.
The lifting unit must not be lifted by the power cable!
7.
Electrical connection
/
Observe the correct operating voltage (see “Technical Data“).
/
Never place the power plug in water.
/
Connect the lifting unit to a properly installed electrical socket (in compliance with the power
supply company regulations) protected by at least a 10 A (slow-blowing) fuse.
/
For units of protection classification I, all exposed conductive parts are connected with a pro
-
tective earth conductor. Before the unit is put into operation, an electrically skilled person must
check that the protective earth cable is properly connected.
/
Temperatures higher than those permitted cause the pump to be shut off by the temperature
limiter. After the temperature limiter is triggered, disconnect the pump from the electric system
before correcting the cause of the fault, otherwise it will switch on automatically once cooled
down.
8.
Set up/installation
ATTENTION!
The relevant standards must be observed.
For use below the backwash level:
/
Guide the discharge line with a loop above the backwash level.
/
If the base of the discharge line loop is more than 5 m above the lifting unit, an additional
checkvalve must be installed.
/
Provide shut off valves.
/
Every drain must be fitted with an odour trap.
Also see installation examples (page 39, figure 3)
.
33
Содержание FLOWBOX-N
Страница 20: ...16 Explosionszeichnung 16 1 Hebeanlage Abbildung 6 20...
Страница 21: ...16 2 Pumpe Abbildung 7 21...
Страница 22: ...17 Ersatzteile 1 2 3 Dichtung 10 4 5 15 16 17 18 19 20 6 12 13 14 9 8 7 11 Dichtung DN 50 22...
Страница 41: ...16 Exploded drawings 16 1 Lifting station Figure 6 41...
Страница 42: ...16 2 Pump Figure 7 42...
Страница 43: ...17 Spare parts 1 2 3 seal 10 4 5 15 16 17 18 19 20 6 12 13 14 9 8 7 11 DN 50 seal 43...
Страница 62: ...16 Sch mas en vue clat e 16 1 Station de relevage Illustration 6 62...
Страница 63: ...16 2 Pompe Illustration 7 63...
Страница 64: ...17 Pi ces de rechange 1 2 3 joint 10 4 5 15 16 17 18 19 20 6 12 13 14 9 8 7 11 joint DN 50 64...
Страница 83: ...16 Splittegninger 16 1 L ftestasjon Figur 6 83...
Страница 84: ...16 2 Pumpe Figur 7 84...
Страница 85: ...17 Reservedeler 1 2 3 tetning 10 4 5 15 16 17 18 19 20 6 12 13 14 9 8 7 11 tetning DN 50 85...
Страница 104: ...16 Rozlo en v kresy 16 1 Zvedac stanice Obr 6 104...
Страница 105: ...16 2 erpadlo Obr 7 105...
Страница 106: ...17 N hradn d ly 1 2 3 t sn n 10 4 5 15 16 17 18 19 20 6 12 13 14 9 8 7 11 t sn n DN 50 106...
Страница 125: ...16 Robbantott br k 16 1 temel llom s 6 bra 125...
Страница 126: ...16 2 Szivatty 7 bra 126...
Страница 127: ...17 Tartal k alkatr szek 1 2 3 t m t s 10 4 5 15 16 17 18 19 20 6 12 13 14 9 8 7 11 t m t s DN 50 127...
Страница 146: ...16 Planos de despiece 16 1 Estaci n elevadora Figura 6 146...
Страница 147: ...16 2 Bomba Figura 7 147...
Страница 148: ...17 Piezas de repuesto 1 2 3 junta 10 4 5 15 16 17 18 19 20 6 12 13 14 9 8 7 11 junta DN 50 148...
Страница 150: ......
Страница 151: ......