
16
O2/CO2
239 WARM
3.4 Initial Startup
Once installation of the gas detector has been completed, it is ready for startup. The
following procedures should be performed before putting the instrument into operation:
1. Check the integrity of all wiring.
2. Apply 24 VDC power.
The instrument should now be powered up. Upon power up the
Dual O2/CO2
monitor LCD
displays the CONCOA logo and then starts a 4-minute (240 second) count down as the
current to the zirconium oxide O
2
sensor stabilizes. The monitor will output a 4 mA signal
during the entire warm-up period. After the countdown, the oxygen sensor will continue to
reach its operating temperature for approximately 30 minutes and the reading displayed
will slowly increase to ambient.
Do not make any adjustments to the reading until after
the monitor has been powered for at least an hour.
NOTE: The
Dual O2/CO2
monitor is supplied with an audio horn, it will activate
momentarily at the completion of the warm up.
NOTE: The
Dual O2/CO2
monitor’s oxygen reading may be adjusted to the
ambient oxygen level. The CO
2
sensor has an auto calibration feature. It also may
be manually calibrated to span gas. See section 6.1 for instructions on adjusting.
Содержание 5803007
Страница 2: ...1 This page intentionally left blank...
Страница 59: ...58 This page intentionally left blank...