A
SSIGNING A
B
ACKUP
P
UMP
Basic 32 Loader Control
UGC007/0702
4-8
O
PERATION
A backup pump can be assigned to replace any of the eight
pump systems during operation.
To assign a backup pump:
Use the Up/Down arrows to scroll to
Loader Config.
Press the Enter arrow.
The Loader Configuration screen displays. Use the
up/down arrows to scroll to VP Back-Up Select.
Press the Enter arrow.
The Pump Back-up Select screen displays. Use the
scroll down/up buttons to select a backup pump
(pumps 1 through 8) or no backup pump.
Press the Enter arrow to save the change.
Press the Previous button to return to
the last screen you were viewing, or the Main
button to return to the Main screen.
1
2
3
4
5
Содержание Basic 32 Loader Control B32
Страница 8: ......
Страница 35: ...5 1 UGC007 0702 Basic 32 Loader Control l Maintenance checklist 5 2 MAINTENANCE...
Страница 46: ......
Страница 50: ......