UGC007/0702
Basic 32 Loader Control
O
PERATION
4-5
To enable the pumps from the main screen:
Use the Up/Down arrows to scroll to
Loader Settings.
Press the Enter arrow.
The Loader Settings screen displays. Use the
up/down arrows to scroll to Pump Enable.
Press the Enter arrow.
The Pump Enable screen displays. Use the up/down
arrows to increase and decrease the pump number.
Use the scroll down/up buttons to enable/disable
the pump.
NOTE: When a pump is disabled the loader completes its
load cycle before the pump is de-energized.
Press the Enter arrow to save the change.
Press the Previous button to return to
the last screen you were viewing, or the Main
button to return to the Main screen.
1
2
3
E
NABLING
AND
D
ISABLING
P
UMPS
WARNING:
Develop and follow procedures
for safe operation of the system to avoid pos-
sible injury or equipment damage.
The B32 allows operators and maintenance
personnel to disable and enable conveying system
components from remote locations. Unexpected
energization of these components could result in
equipment damage or injury.
Safe operating procedures should include:
r
Disconnect any loader, pump or material
valve from main power and/or compressed air
sources before servicing. Ensure that all energy
sources for the device are locked out and
tagged.
r
Before removing lockout devices or enabling
pumps, loaders or material valves, make sure
that all personnel are clear of the machine,
tools have been removed and any safety guards
have been reinstalled.
4
5
Содержание Basic 32 Loader Control B32
Страница 8: ......
Страница 35: ...5 1 UGC007 0702 Basic 32 Loader Control l Maintenance checklist 5 2 MAINTENANCE...
Страница 46: ......
Страница 50: ......