background image

2.Locating the footings for the playhouse structure

     

a.  

Place the assembled platform next to the upright ladder.

     b.  

Line up the support plates of the assembled platform with 

the inside rail of the vertical ladder.  Make sure that the platform is 

straight against the vertical ladder.  Refer to fi gure 2a.

     

c.

  At each corner, mark the ground for the footings, move the 

platform out of the way and dig the holes. Refer to fi gure 2b.

Figure 2b

3.Playhouse Assembly

There are several different barrier confi guration possibilities.  

These confi gurations are determined by the number of exits on 

your set and the way that you want the structure assembled in 

your yard.  Please refer to the following lay out illustrations to 

determine how to assemble the playhouse using the confi gura-

tion that you have purchased.

     

a. 

 Locate the four playhouse legs.  Measure 45” from the end of the pipe to the center of the fi rst hole to determine which 

end of the pipe is the top.

     

b. 

 Make a mark 4 ½” down from the top of each playhouse leg.

     

c. 

 Identify the layout illustration that shows the correct amount of exits included in your set.

     d.

  Lay the barriers out as shown in the illustration that represents your particular confi guration.  Loosely install set screws 

into each barrier sleeve.

     e.

  Pay particular attention to the position of each barrier in relation to the barrier at each side.  The layout of the barriers 

should follow an 

over and under

 pattern beginning with the entrance barrier.  Please refer back to the layout illustration and 

note the positioning pattern of the barriers.

Figure 2a

Optional Horizontal 

Ladder

Toprail

Upright

Ladder

Содержание PH35-10

Страница 1: ...top rail _____1 5 6 x 2 top rail _____1 10 Plastic Rocket Slide _________ _____ 1 Rocket Slide Foot _____ 2 PH Canopy Arches _____2 5 swing seats __________________ _____1 trapeze bar ________________...

Страница 2: ......

Страница 3: ......

Страница 4: ...T Nut Grabber Screw Lag Screw 14 Sheet Metal Screw 14 Truss Screw Plug Panel Clamp Brace Band Carabineer Spring Clip Not every model will have every component or swing part Pictures are not to scale...

Страница 5: ...les previously dug 8 Insert the 5 top rail into the top sleeve of the vertical ladder that will be used to access the Playhouse deck 9 Measure the height of the top rail to insure proper swing height...

Страница 6: ......

Страница 7: ...set screws and the top of the 3rd leg sleeve 2 set screws 3rd Leg 3rd leg sleeve Slide 3 8 x 2 3 4 bolt through the two holes and secure with the 3 8 nyloc nut On the bottom side of the sleeve insert...

Страница 8: ...t apart and attach to the support plates using the 2 grabber screw Refer to Top View e The platform should just square its self up as it is assembled However you should verify that the platform is squ...

Страница 9: ...to determine how to assemble the playhouse using the con gura tion that you have purchased a Locate the four playhouse legs Measure 45 from the end of the pipe to the center of the rst hole to determi...

Страница 10: ...out illustration with TWO EXITS Layout illustration with ONE EXIT 4 Under 4 Under 4 Under 4 Under 3 Over 3 Over 3 Over 3 Over 2 Under 2 Under 2 Under 2 Under 1 Over 1 Over 1 Over 1 Over Playhouse Leg...

Страница 11: ...er 4 Under 4 Under 3 Over 3 Over 3 Over 3 Over 2 Under 2 Under 2 Under 2 Under 1 Over 1 Over 1 Over 1 Over Playhouse Leg Playhouse Leg Playhouse Leg Playhouse Leg Optional Horizontal Ladder Optional H...

Страница 12: ...oles previously drilled into the platform support plates The platform sup port plates should be vertical Attach the platform to the legs In each leg use the following 2 5 16 x 3 hex bolts 2 5 16 at wa...

Страница 13: ...tructure The two legs that are on the ground should be laying just over the ladder hole and the adjacent leg hole as shown in gure 4d k Stand the playhouse into the holes previously dug Figure 4e and...

Страница 14: ......

Страница 15: ...on will allow your slide to receive a lot of abuse If the slide is hit from the side by a lawn mower or similar device either the sheetrock screw will break or the screw head will pull through the sli...

Страница 16: ...rch Leg Playhouse Leg STEP 1 Slide Arches into Canopy Pockets Top of Arches should curve away from each other STEP 2 Slide all four Arch Legs into Playhouse Legs at the same time Tighten Set Screws Ca...

Страница 17: ...t Plug Plastic Pivot 7 16 Washer Bracket with welded bolt Push two 1 3 8 Plugs in the ends 3 8 Nyloc Nut Assemble Steering Wheel as shown above Then attach Bracket to the Barrier with panel clamps and...

Страница 18: ...cope under the lip of the plastic ring and attach the other half of the plastic ring Plastic Ring Halves Bracket with welded washer Push 1 3 8 Plugs into both ends Telescope Base Assemble Telescope as...

Страница 19: ...abuse of this playground equipment is dangerous and can cause serious injury This equipment should be inspected before each use and any worn defective or missing parts should be replaced Children sho...

Страница 20: ...gers may become discolored or may eventually rust Should this happen a touch up using a cold galvanizing compound followed by a coat of silver aluminum spray paint will make them look new again These...

Страница 21: ...le helmets when using playground equipment 4 Remove drawstrings from hoodie s and jackets Remove attached mittens and gloves These can become entangled with the equipment and present the risk of stran...

Страница 22: ...not cover damage resulting from flood fire catastrophe or other acts of nature To the extent permitted by law Component Playgrounds shall not be liable for any direct indirect special incidental or c...

Страница 23: ..._______ CUSTOMER INFORMATION Project Name _______________________________________ Contact Person _____________________________________ Address ___________________________________________ City ________...

Отзывы: