background image

 

Installation Instructions

 

PH35-10

Wheelbarrow

Shovel

Digging Bar or Pick

Allen Wrench (provided)

Hammer or Mallet

Marker Pen

Ladder

Tape Measure

Level

Open end or box wrench’s:

  5/8”, 9/16”, 3/4”, 1/2”

Ratchet Handle & Sockets:

  5/8”, 9/16”, 3/4”, 1/2”

Cordless or electric drill w/bits as Follows:

  Phillips, 3/8” drill bit

1.  Select an area in your yard that is reasonably level and meets the space requirements for your equipment.  PH35-10 

Ground space: 8’ x 32’.  Play space: 12’ x 43’.

2. 

Position the horizontal ladder in your yard where you want the unit to finally stand.  Measure and be certain that all 

necessary clearances for the deck and swinging space are available in this position.  

3. 

Using a tape measure and marker, mark location of the Ladder and swing hangers along the 5’ top rail.  See the detail 

on the front page of your installation instructions.

4. 

With the horizontal ladder in position on the ground, locate and  mark the holes for the two upright ladders.  Move 

the horizontal ladder out of the way and dig the holes for the upright ladders.  (See #1: Hole size for upright ladder)  

5.  Lay each vertical ladder on the ground near the hole where it will eventually stand.  Make a mark 15” from the top 

of the ladder onto each ladder rail of the 8’ four rung.  Make a mark 39” from the top of the ladder onto each ladder 

rail of the 10’ ladder.  Move the adjustable sleeves to these marks and position them to receive the horizontal ladder 

by turning them to point at a 90 degree angle (towards what will become the inside of the structure.) Away from the 

upright ladder.  Secure the set screws.  

6.  Place the vertical ladders onto their sides.  Hint: The 8’ four rung is used for access to the deck.  The 10’ three rung 

is to be used at the swings end away from the deck.  The ladder rungs should be positioned to allow for access into 

the Playhouse.  Attach the overhead ladder to the vertical ladders and secure the set screws.  See  #4 horizontal lad-

der connection to upright ladder.   Hint: Do not push the overhead ladder tight against the vertical ladders.  Leave a 

½” to 1” gap between the vertical ladder rails and the overhead ladder.  This will allow for easier adjustment of the 

overhead ladder in the future.  

7. 

Using two strong adults, stand the horizontal ladder portion into the holes previously dug.

8.  Insert the 5’ top rail into the top sleeve of the vertical ladder that will be used to access the Playhouse deck.  

9.  Measure the height of the top rail to insure proper swing height.  Level the structure.

10. 

Refer to: Playhouse Assembly and Installation Instructions.  Assemble the Playhouse deck and structure, and position 

the deck as shown.  

11. Attach the slide as shown on the slide assembly sheet.

12. Attach any additional climbers as may be necessary.

13. 

Using a the tape measure and marker, measure and mark the locations of the swing hangers and the vertical ladder 

along the length of the 8’ top rail.  (Refer to the detail on the front page of the PH 35 installation instructions.)

14. Install the 8’ top rail into the top sleeve of the vertical ladder at the swing end  of the horizontal ladder.  Securely 

tighten the set screws in the top sleeve of the vertical ladder.

15. Assemble swing hangers as shown on the swing hanger assembly sheet and attach to the top rails as instructed. 

16. 

Using a hammer, install the 2-3/8” plugs into the open ends of the top rails.

17. 

Before installing the third leg, locate the un-smashed end of the third leg with the hole drilled approximately 3” from 

the bottom.  Insert ⅜” x 3½” Hex Bolt and loosely thread ⅜” Nut on the other side.  Nut will not thread all the way 

on and bolt will be loose.  (This is to act as an anchor in the concrete and does not need to be tight.)

18. 

Install the third leg onto the 10’ ladder by first measuring away from the ladder about 5-1/2’.  Mark the spot and dig 

the hole about 18” deep.  Drop the leg into the hole and place the smashed end over the bolt that is welded to the 

ladder top sleeve.  

19. 

Securely fasten the third leg to the ladder with a 3/8” nyloc nut.  Hint: The third leg can be used to help level the 

structure by pushing or pulling the ladder as may be necessary.

20. Check the level of the entire structure and adjust as necessary.

21. 

When you are satisfied that the structure is level, mix and pour the concrete according to the package directions. You 

will use approximately seven 80# bags in the ladder hole and 1 ½ bags in each of the leg holes.

22. Allow the concrete to cure completely before using your swing set. (3-5 days).

23. Attach chains and swinging items and enjoy your Component Playground.

PLEASE READ AND UNDERSTAND ALL INSTRUCTIONS BEFORE BEGINNING

*Before digging, Please obey local laws by notifying your local utilities marking organization*

Required Tools

Содержание PH35-10

Страница 1: ...top rail _____1 5 6 x 2 top rail _____1 10 Plastic Rocket Slide _________ _____ 1 Rocket Slide Foot _____ 2 PH Canopy Arches _____2 5 swing seats __________________ _____1 trapeze bar ________________...

Страница 2: ......

Страница 3: ......

Страница 4: ...T Nut Grabber Screw Lag Screw 14 Sheet Metal Screw 14 Truss Screw Plug Panel Clamp Brace Band Carabineer Spring Clip Not every model will have every component or swing part Pictures are not to scale...

Страница 5: ...les previously dug 8 Insert the 5 top rail into the top sleeve of the vertical ladder that will be used to access the Playhouse deck 9 Measure the height of the top rail to insure proper swing height...

Страница 6: ......

Страница 7: ...set screws and the top of the 3rd leg sleeve 2 set screws 3rd Leg 3rd leg sleeve Slide 3 8 x 2 3 4 bolt through the two holes and secure with the 3 8 nyloc nut On the bottom side of the sleeve insert...

Страница 8: ...t apart and attach to the support plates using the 2 grabber screw Refer to Top View e The platform should just square its self up as it is assembled However you should verify that the platform is squ...

Страница 9: ...to determine how to assemble the playhouse using the con gura tion that you have purchased a Locate the four playhouse legs Measure 45 from the end of the pipe to the center of the rst hole to determi...

Страница 10: ...out illustration with TWO EXITS Layout illustration with ONE EXIT 4 Under 4 Under 4 Under 4 Under 3 Over 3 Over 3 Over 3 Over 2 Under 2 Under 2 Under 2 Under 1 Over 1 Over 1 Over 1 Over Playhouse Leg...

Страница 11: ...er 4 Under 4 Under 3 Over 3 Over 3 Over 3 Over 2 Under 2 Under 2 Under 2 Under 1 Over 1 Over 1 Over 1 Over Playhouse Leg Playhouse Leg Playhouse Leg Playhouse Leg Optional Horizontal Ladder Optional H...

Страница 12: ...oles previously drilled into the platform support plates The platform sup port plates should be vertical Attach the platform to the legs In each leg use the following 2 5 16 x 3 hex bolts 2 5 16 at wa...

Страница 13: ...tructure The two legs that are on the ground should be laying just over the ladder hole and the adjacent leg hole as shown in gure 4d k Stand the playhouse into the holes previously dug Figure 4e and...

Страница 14: ......

Страница 15: ...on will allow your slide to receive a lot of abuse If the slide is hit from the side by a lawn mower or similar device either the sheetrock screw will break or the screw head will pull through the sli...

Страница 16: ...rch Leg Playhouse Leg STEP 1 Slide Arches into Canopy Pockets Top of Arches should curve away from each other STEP 2 Slide all four Arch Legs into Playhouse Legs at the same time Tighten Set Screws Ca...

Страница 17: ...t Plug Plastic Pivot 7 16 Washer Bracket with welded bolt Push two 1 3 8 Plugs in the ends 3 8 Nyloc Nut Assemble Steering Wheel as shown above Then attach Bracket to the Barrier with panel clamps and...

Страница 18: ...cope under the lip of the plastic ring and attach the other half of the plastic ring Plastic Ring Halves Bracket with welded washer Push 1 3 8 Plugs into both ends Telescope Base Assemble Telescope as...

Страница 19: ...abuse of this playground equipment is dangerous and can cause serious injury This equipment should be inspected before each use and any worn defective or missing parts should be replaced Children sho...

Страница 20: ...gers may become discolored or may eventually rust Should this happen a touch up using a cold galvanizing compound followed by a coat of silver aluminum spray paint will make them look new again These...

Страница 21: ...le helmets when using playground equipment 4 Remove drawstrings from hoodie s and jackets Remove attached mittens and gloves These can become entangled with the equipment and present the risk of stran...

Страница 22: ...not cover damage resulting from flood fire catastrophe or other acts of nature To the extent permitted by law Component Playgrounds shall not be liable for any direct indirect special incidental or c...

Страница 23: ..._______ CUSTOMER INFORMATION Project Name _______________________________________ Contact Person _____________________________________ Address ___________________________________________ City ________...

Отзывы: