A- Secure the first two boards into place at each end of the platform structure using the 13/64” drill bit to pre drill
the holes through the plastic and into the floor joist. Secure the boards into position using the #14 x 2 ½ pan Phillips
SMS. The leading edge of the board should be flush with the edge of the square tubing. Now that these two boards
are secure lay each of the remaining boards up and onto the floor structure and space them out evenly and to your
satisfaction. They will be approximately ½” apart from each other, as shown in the diagram below.
Installing the plastic Lumber
Tools needed:
Electric drill, 13/64” drill bit, 18 or 20 volt impact driver (preferred tool) or a cordless or electric drill
can be used to drive the screws.
Содержание PH30-10
Страница 26: ......