Model MT40-10 Continued
Installation Instructions
Holes 28”x20”x24” (approx.
6-7 80 lb bags of concrete
mix)
(A)
Upright Ladder
24”
20”
28”
(B) A Frame Legs
Holes 18” wide x 12” deep
(approx. 1 ½ 80 lb bags
concrete mix per hole.)
12”
18”
#1 Hole Sizes for
Cementing
in the Set
#2 A Frame Leg
Assembly
3/8” x 2 ¾” Hex Bolt
with 3/8” Nyloc Nut
(1 each per leg)
3/8” x 3/8”
Set Screw
(1 each per leg)
Slide in leg, bolt in
place and secure
with set screw
A Frame
Leg
Slide Top Rail joint into place
about 1 inch inside the Ladder
Top Sleeve & secure with two
3/8” x 3/8” Set Screws
Top rail
Ladder
#3 Ladder to Top Rail Assembly
Triple
End
(D) Turning Bar
Holes 12” x 12”
deep (Approx. one
80 lb. bag of
concrete mix per
hole)
(C) Third Leg
Hole 18” x 18”
(Approx. two 80 lb.
bags of concrete
mix)
2 Set Screws
Set screws
Set Screws
Set screw holes