Top Rail Assembly
Step 1: Slide the undrilled end of the longer Top Rail as far as it will go into the
Sleeve of the Triple End.
Step 2: Slide the Swing Hangers and tighten onto the Top Rail during the Top Rail
Assembly process. (Refer to spacing diagram and graphic found above)
Step 3: Insert and tighten (4) 3/8” x 3/8” set screws into each of the Triple End
Sleeves using Allen Wrench provided.
Step 4: Slide smaller diameter part of shorter top rail into the open end of the
longer top rail which is already attached to triple end.
Step 5: Insert and tighten additional set screws to join top rails together
Step 1
Step 2