background image

 

 

Содержание GF-30AC-T

Страница 1: ...GF 30AC T Ground Circuit Tester Instruction Manual...

Страница 2: ...represents the latest in high current production line testing To fully appreciate all the features of your new meter we suggest that you take a few moments to review this manual Compliance West USA s...

Страница 3: ...3...

Страница 4: ...Duration Adjustment 12 Operating Techniques 12 Setting the Test Time Duration 12 Testing the EUT 12 Test results 13 Green Light 13 Red Light 13 Red Light and Buzzer Sound 13 Simultaneous Red and Gree...

Страница 5: ...etermined amount of time after the Test Button has been released The instrument advises the operator of any internal malfunction affecting the output A one time setup procedure allows the instrument t...

Страница 6: ...est Duration Timer 0 25 sec approx Duty cycle 100 ENVIRONMENTAL Operating Temperature 15 35 C Relative Humidity Range 0 90 non condensing GENERAL Input power requirements See rear panel for input volt...

Страница 7: ...rotection is provided to prevent damage during shipment We recommend that the instrument be surrounded by at least one inch of shock absorbing material on all sides of the container Remove the Tester...

Страница 8: ...Red Fail Indicator Lamp Incandescent lamp When lit indicates that equipment under test has more than 100 milliohms in grounding path or is incorrectly connected to tester Replace with 6 3V type 86 la...

Страница 9: ...section of this manual for procedure 5 Appliance Inlet Fuseholder Power Switch Use 18 AWG cordset to connect tester to appropriate source of supply Replace line fuse Turn tester ON OFF 6 Fuse replacem...

Страница 10: ...ductive surface Push the Test button The GF 30AC T should indicate a Fail by lighting the red light and sounding the internal buzzer If your Tester yielded the proper results it is working properly If...

Страница 11: ...safety agency inspection personnel Adjusting the Pass Fail Point for products with non removable power cords Use this adjustment procedure if the equipment under test uses a non detachable power cord...

Страница 12: ...t will continue for the amount of time set during this Procedure after the Test Button is released Therefore we recommend that the Test Duration control be adjusted to its minimum position when a manu...

Страница 13: ...the ground system of the EUT has less than 100 milliohm resistance For most categories of equipment this result is acceptable Red Light A red light indicates the ground system of the EUT has more than...

Страница 14: ...er operation by following steps 1 3 in Adjusting the Pass Fail Point using the supplied Test Cordset Press the Test Button and measure the voltage across the calibration resistor If the unit is workin...

Страница 15: ...st USA is available Phone 800 748 6224 Hours 8 00 AM 4 00 PM Pacific Time Also available on our web site at www compwest com Contact Compliance West USA 650 Gateway Center Way Suite D San Diego CA 921...

Страница 16: ...The Test equipment required for both the performance test and calibration is a DMM able to read true rms 0 3 VAC 1 Service Information The GF 30AC T is warranted to the original purchaser for a perio...

Страница 17: ...iagram for high voltage areas Cleaning CAUTION Do not use aromatic hydrocarbons or chlorinated solvents for cleaning These solutions will react with the plastic materials used in the instrument Clean...

Страница 18: ...el calibration resistor using the alligator clip wire assembly 3 Connect the DMM across the calibration resistor 4 Push and hold the Test Button on the front panel For a 25 amp output the DMM should r...

Страница 19: ...libration resistor is 2 5 Vrms Using Ohms law this corresponds to an output current of 25 Amps Other output current levels can be set in the same manner Adjust Buzzer 5 With the calibration resistor s...

Отзывы: