VI. Installation of the Slats
•
The slats may only be exposed to the sunlight when floating on the
swimming pool water. The slats have to be put immediately from the
box onto the water. The remaining slats in the box always have to
be covered from the sunlight !!!
•
Respect the sequence of the slats in the crate: the slats for the pool
end are on top, those connecting to the shaft are at the bottom.
•
Orientation of the slats: the curved side is the top side, open side
towards pool end.
•
Roll up the slats while carrying them to the pool. They come in a
carboard box with different layers. Each layer has 9 slats.
•
With solar slats the filtration pump must always be switched on
when the cover is closed !!
Содержание Rollo Cover
Страница 1: ...CompassPools Rollo Cover Installation Manual ...
Страница 6: ...II 1 Exploded view of the different parts of the mechanism ...
Страница 21: ...III 1 Installation sequence Drill 3 holes Ø10mm through pool and panel on the left and right hand side ...
Страница 22: ...III 1 Installation sequence Smooth the pool wall Inject enough silicone type INNOTEC ...
Страница 26: ...IV 1 Technical drawing of the SS frame Earth connection Regulating bracket ...
Страница 54: ...VII 1 Electrical preparations VII 1 Electrical preparations Motor cable is always 10m long ...