WARNING:
To avoid the risk of personal injury, be careful when
pressing the component rail release latches and sliding the component
into the rack. The slide rails could pinch your fingertips.
3. Depress the component rail release latch on either side of the server and
slide the server into the rack.
IMPORTANT:
The first time you slide the component into the rack, you may have
to apply some pressure. After the first time, the ball bearings in the slide will move
easily.
IMPORTANT:
When servicing the server, fully extend the component until the
latches lock. To return the server to the rack, depress the latches and slide the
server into the rack.
4. Secure the server face plate to the front of the rack by screwing the
thumb screws into the cage nuts.
5. Tighten the thumb screws before you close the rack door to prevent the
door from hitting protruding thumb screws.
Attaching the Cable
Management Arm
A double-hinged cable management arm and fasteners ship with each server.
The cable management arm attaches to the server's cable management arm
bracket and to the rear frame of the rack. All cables to and from the server are
tied to this arm. The two hinges allow the cable management arm with attached
cables to swing out of the way when you need to access the server pull-out
trays.