. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4-10
Overview of Installing ProLiant 2500R Server and Hardware Options
Writer:
BETTYD
Project:
Overview of Installing ProLiant 2500R Server and Hardware Options
Comments:
Rack chapter for Brenda Pereira's Guide
File Name:
G_CH04.DOC
Last Saved On:
8/2/96 10:57 AM
2. Extend the component rail from the bracket slide rail until the
component rail release latch clicks. Holding down the latch, slip this
piece out of each bracket rail, as shown in the following figure.
CZR4-005.eps
Figure 4-5.
Removing the component rail from the bracket rail
3. Put the component rails to one side. You will attach them to the rack
server chassis later, in the section, "Attaching Component Rails to the
Server."
The next figure shows the separated bracket rail with its inner sliding piece and
the flat, one-piece component rail.
Содержание 2500 - ProLiant - 64 MB RAM
Страница 1: ... NOTICE 0112 3 4 5 5 6 01127 8901 2 0 ...