The Community Loft
22
2
Checklist in order of installation:
1 single and 2 double platforms,
1 half and 1 circular plug?
2 sets of stairs with 3 short posts?
2 pairs of railings with 2 short
couplings at bottom and 2 long
couplings at top?
3
Checklist in order of installation:
7 upper panels?
All panels and couplings held
properly by the connectors?
12 caps screwed down tight?
Move against the wall, or away from
the wall for passageway behind.
Refer to Safety page.
Levelling feet adjusted?