The Community Loft
18
2
Checklist in order of installation:
1 single and 2 double platforms,
1 half and 1 circular plug?
2 sets of stairs with 3 short posts?
2 pairs of railings with 2 short
couplings at bottom and 2 long
couplings at top for each set?
3
Checklist in order of installation:
7 upper panels?
All panels and couplings held
properly by the connectors?
12 caps screwed down tight?
Move against wall or move away
from wall for a passageway behind.
Refer to Safety page.
Levelling feet adjusted?