Chapter 5
RP5100r installation
OneCell
®
Hardware Installation, Release 4.5
5-4
DR
AF
T
Figure 5-3.
RJ45, IP67 connector assembly
Pole mount installation
There is vertical orientation for pole mount installations
NOTE
The minimum pole diameter requirement is 4'' (102mm).
Vertical pole mount
1
Slide the two U bolt clamps onto the pole and secure the RP mounting plate to the
clamps with four nuts.
Содержание OneCell
Страница 7: ...Contents OneCell Hardware Installation Release 4 5 vii DRAFT ...
Страница 10: ...List of tables x M0303A2 4 5 01 September 2020 DRAFT ...
Страница 12: ...Document revision history xii M0303A2 4 5 01 September 2020 DRAFT ...
Страница 18: ...DRAFT ...
Страница 24: ...Chapter 1 CommScope OneCell overview 1 6 M0303A2 4 5 01 September 2020 DRAFT ...
Страница 28: ...DRAFT ...
Страница 72: ...Chapter 4 RP5100i installation 4 36 M0303A2 4 5 01 September 2020 DRAFT Installation is complete ...
Страница 77: ...Chapter 5 RP5100r installation 5 5 M0303A2 4 5 01 September 2020 DRAFT ...
Страница 98: ...Chapter 6 RP2000 Installation 6 12 M0303A2 4 5 01 September 2020 DRAFT Installation is complete ...
Страница 106: ...Chapter 6 RP2000 Installation 6 20 M0303A2 4 5 01 September 2020 DRAFT 6 Attach the Radio Point to the octagon box ...
Страница 111: ...Chapter 6 RP2000 Installation OneCell Hardware Installation Release 4 5 6 25 DRAFT Installation is complete ...
Страница 112: ...Chapter 6 RP2000 Installation 6 26 M0303A2 4 5 01 September 2020 DRAFT ...