![CommScope OneCell Скачать руководство пользователя страница 115](http://html1.mh-extra.com/html/commscope/onecell/onecell_hardware-installation-manual_2643754115.webp)
Chapter 7
RP2100 Installation
7-3
M0303A2 4.5.01 September 2020
DR
AF
T
Mounting the Radio Point (RP) on a wall requires the following hardware provided by
the system integrator:
• Four molly screws capable – 50 lb (23 kg) minimum rating
Before installing the RP on the pole, terminate the RP end of the Ethernet cable with
the RJ45, IP67 connector provided in the box.
NOTE
Once the Radio Point is installed and the powered on, it may take up to 20 minutes
for the frequency to stabilize and lock.
Содержание OneCell
Страница 7: ...Contents OneCell Hardware Installation Release 4 5 vii DRAFT ...
Страница 10: ...List of tables x M0303A2 4 5 01 September 2020 DRAFT ...
Страница 12: ...Document revision history xii M0303A2 4 5 01 September 2020 DRAFT ...
Страница 18: ...DRAFT ...
Страница 24: ...Chapter 1 CommScope OneCell overview 1 6 M0303A2 4 5 01 September 2020 DRAFT ...
Страница 28: ...DRAFT ...
Страница 72: ...Chapter 4 RP5100i installation 4 36 M0303A2 4 5 01 September 2020 DRAFT Installation is complete ...
Страница 77: ...Chapter 5 RP5100r installation 5 5 M0303A2 4 5 01 September 2020 DRAFT ...
Страница 98: ...Chapter 6 RP2000 Installation 6 12 M0303A2 4 5 01 September 2020 DRAFT Installation is complete ...
Страница 106: ...Chapter 6 RP2000 Installation 6 20 M0303A2 4 5 01 September 2020 DRAFT 6 Attach the Radio Point to the octagon box ...
Страница 111: ...Chapter 6 RP2000 Installation OneCell Hardware Installation Release 4 5 6 25 DRAFT Installation is complete ...
Страница 112: ...Chapter 6 RP2000 Installation 6 26 M0303A2 4 5 01 September 2020 DRAFT ...