TECP-90-702 • Issue 4 • April 2017
Page 12
© 2017, ADC Telecommunications, Inc.
8. Position the isolation pad and frame on the concrete, as shown in
.
Figure 11. Positioning Isolation Pad and Frame
24996-A
TEMPLATE/ISOLATION PAD
(SHADED FOR CLARITY)
ALIGN SLOTS IN RACK AND
TEMPLATE/ISOLATION PAD
WITH THREADED RODS