5.4
Using the Horizontal Management Panel
To store a length of cable in the storage deck panel, perform the following procedure:
1. Store the first cable on the rear spools, making sure that the final turn comes off the inner
part of the rear spool as shown in
. Then route the cable to the left rear corner of
the panel.
2. Next, route cable toward the front left front of the management panel and out into the
vertical cable guide; adjust cable slack as necessary to ensure that no pinching or binding
occurs.
3. Store the second cable on the pair of spools at the front of the storage panel; when it exits
the spools, route it through the cable guide at the back of the panel.
4. Complete a designation label for the stored patch cord and apply label to front edge of
management panel assembly.
5. Repeat procedure for each patch cord to be stored.
Figure 15. Horizontal Management Panel Cable Storage
Caution:
Do not kink or make a sharp bend in the patch cord when forming loop. Excessive
bending may damage the optical fiber within the patch cord
.
18878-A