Step 5 – Connect Fiber Cables to Modules 

1.  Store slack fiber cable in shelf as 

shown behind modules in loops. 

Important:

  Leave sufficient slack in 

fiber cable to plug MPO connectors 
into modules and 

leave                

enough room for modules to pivot into 
up position.  Do not exceed minimum 
bend radius for fiber cable. 

2.  Install adhesive backed fiber routing 

clips to floor of shelf and secure routed 
fiber cable with Mille-Ties or hook-and-
loop fastener strips. 

 
 
 

 

3.  Install MPO connections to 

InstaPATCH

 modules, plug each MPO connector into back of module as shown 

above. 

 

LC Ports 1-6

MPO Port 1 

 

LC Ports 7-12

MPO Port 2 

 

LC Ports 13-18 

MPO Port 3

 

 

LC Ports 19-24

 MPO Port 4

 

Note

:  Use triangular holes in bottom of shelf tray to gain better access to bottom module MPO connections. 

Step 6 – Install Cover

 

1.  Remove protective film from cover before installing.  

2.  From front of shelf, position cover between upper 

and lower sets of tabs on each side of shelf behind 
modules.  Bend cover slightly up in the middle to 
engage tabs and slide into place. 

 

 

 
 

 

 

Fiber
routing clip

 

Install

cover

 

Содержание 3603D-1U-144LC-LS-A

Страница 1: ...BETA orientation or panels Additional shelf configurations provide for fusion splicing when using LC pass thru panels Ordering information is listed below Material ID Part No Description 760110999 3603D 1U UP Fiber shelf 1U UHD empty 760136457 3603D 1U 144LC LS A 3603D 1U UP UHD shelf with three 3603M 48LC LS UHD modules in ALPHA orientation 760136465 3603D 1U 144LC LS B 3603D 1U UP UHD shelf with...

Страница 2: ... parts against the parts list below Quantity Description Splice Shelf Empty Shelf Preloaded Shelf 1 1 Empty shelf assembly with 19 rack mount brackets 1 Shelf assembly with 19 rack mount brackets and preloaded with one of the following sets of modules or panels 3 3603M 48LC LS UHD modules in ALPHA orientation 3 3603M 48LC LS UHD modules in BETA orientation 3 3603M 48LC SM UHD modules in ALPHA orie...

Страница 3: ...the anti tamper label or removal of top cover or front adapter mounting panel will void the warranty Fiber optic cable and jumper performance is sensitive to bending pulling and crushing Minimum bend radius must be maintained during installation per the manufacturer s specification Appropriate pulling grips must be used during installation and pulling forces shall not exceed manufacturer s recomme...

Страница 4: ...abinet Mount Caution Preloaded shelf configurations require two people for installation in equipment rack 1 Determine desired mounting location in 19 483mm rack or cabinet 2 Mount shelf to rack or cabinet using pre installed mounting brackets and four 12 24 x 3 8 screws or four M6 screws provided 3 Mount rear stabilizer brackets to rack cabinet with four 12 24 screws or four M6 screws as shown Mou...

Страница 5: ...shelf fully extended Cable tie or hook and loop strip 3 76mm below shelf Cable ties or hook and loop strips installed on outside of shelf slide Note This shelf is designed for direct connection of cables using cable glands inserted into cable entry ports as shown above Another method for securing cables is the use of optional rack mounted brackets See instruction sheet 860380781 for using rack mou...

Страница 6: ...it to pass through selected opening and enter shelf Note It may be necessary to temporarily remove a plug from an adjacent opening to provide sufficient clearance for gland nut to be inserted through opening 8 Insert threaded body of cable gland into opening and tighten gland nut onto threaded section to secure cable gland unit to shelf Note The two recommended methods Method A and Method B for ro...

Страница 7: ...and loop strip 3 Verify that shelf retracts and extends fully before proceeding Slack loop in cables with shelf in retracted position Method A Cable ties or hook and loop strips Method B Shelf fully retracted 4 The above figure shows typical fiber loop for both Method A and Method B fiber routing when shelf is retracted Step 2B Routing Multiple Cables into Sliding Shelf Method A Shown Cabe entry p...

Страница 8: ...79 provided with the modules Note InstaPATCH 360 UHD modules must be configured as shown below for proper polarity Identical modules are used at both ends of cable but module orientation is inverted from end to end Module at one end of trunk cable must be oriented in ALPHA configuration while module at opposite end of cable must be oriented in BETA configuration Preloaded shelves come with modules...

Страница 9: ...elf so that the pivot lock pin is in back of the pivot bracket Note Panel module pivot lock pin can only be inserted from the rear of pivot mounting bracket 3 Depress the lever arm on the pivot mounting bracket and slide panel module forward until pivot lock pin engages the hole in pivot mounting bracket 4 Release lever arm of pivot mounting bracket to secure the panel module in place Subsequent p...

Страница 10: ...e with Mille Ties or hook and loop fastener strips 3 Install MPO connections to InstaPATCH modules plug each MPO connector into back of module as shown above LC Ports 1 6 MPO Port 1 LC Ports 7 12 MPO Port 2 LC Ports 13 18 MPO Port 3 LC Ports 19 24 MPO Port 4 Note Use triangular holes in bottom of shelf tray to gain better access to bottom module MPO connections Step 6 Install Cover 1 Remove protec...

Страница 11: ... clamps on trough and install hook and loop fastener around patch cords and through slots at trough exit 4 Place fiber patch cords into management sleeve wrap and fasten hoop and loop fastener running the length of Management Sleeve 5 The Management Sleeve may be additionally tied off in rack or cabinet vertical by using the rear webbings and cable ties Management sleeve may be route up down or st...

Страница 12: ...ed for optional mounting scheme 4 positions Buffer tube tie down rail 4 positions Splice sleeve holders 2 Positions External buffer tube tie down points 6 positions Cover retention snaps 6 positions Fiber retention gate 2 positions Retention slots 6 positions Top cover Snap rivet grommet 4 positions Snap rivet plunger 4 positions Note Snap rivet grommets and plungers are not used for single tray i...

Страница 13: ... the same length and to enter shelf in the same location to facilitate manageable spooling of slack loop into shelf for tray installation Keep buffer tubes on rearward facing side of splice tray so as to keep patchcord exit ports as unobstructed as possible Use cable ties provided to restrain buffer tubes to tie down rails on tray Tray is designed for 3mm and 4mm buffer tube diameters Larger diame...

Страница 14: ...n tray and fiber as desired UHD positioning is shown above into shelf Remove paper backing from splice tray and press down on tray firmly at several locations around its perimeter to insure that adhesive contacts shelf surface as desired 3 Spool buffer tube slack behind tray and use cable ties to attach it at the external buffer tube tie down points as required 4 Terminate pigtails into adapters 5...

Страница 15: ...rms of previous tray Additional trays must be rotated 180 from the previous tray orientation 2 Install snap rivet grommets and plungers 3 Install top cover 4 Repeat as required Note Three trays may be used in a 1U shelf for a total of 144 fusion splices Six trays may be used in a 2U shelf for a total of 288 fusion splices and twelve trays may be used in a 4U shelf for a total of 576 fusion splices...

Отзывы: