background image

 

COMEX S.A. 

 

 

 

 

CMX: 202023.01 EN

 

16 

 

Figure 3 

Step 5. Select Finish to finalize the installation (Shown in Figure 4). 
 

 

Figure 4 

Launch Program 

To launch the Power Device Network Utility and get started, select Programs from the Start menu in 
Windows and locate the new folder and icons for Power Device Network Utility. Select Power Device 
Network Utility from the program folder (Shown in Figure 5). 

 

Figure 5. Power Device Network Utility 

Содержание ATS 16M

Страница 1: ...Automatic Transfer Switch ATS 16S ATS 16M User s Manual ...

Страница 2: ...nput Power Cord Retention Cable Clip Installation 7 Power Cord Retention Clip Installation 8 Removing the Power Cord Retention Clip 9 Operation 10 Remote Management 10 Web 10 Telnet SSH 10 SNMP 10 Local Management 10 LCD Operation 10 LED Indicators 11 Device Reset 12 Unattended Automatic Shutdown 12 Troubleshooting 13 Appendix A 14 Appendix B 15 Overview 15 Installation 15 Launch Program 16 Gettin...

Страница 3: ... Precautions Read the following before installing or operating the Automatic Transfer Switches ATS PDU Use only the supplied hardware to attach the mounting brackets The ATS PDU must be plugged into a single phase three wire grounded outlet on a circuit that is protected by a fuse or circuit breaker Connection to any other type of power outlet may result in a electrocution hazard Do not use extens...

Страница 4: ...Ties x18 M4x8 Bracket Mounting Screws x24 RJ45 DB9 Serial Port Connection Cable x1 M5x12 Rack Mounting Screws x6 Washers x6 Jumper Switched type only x1 Cord Retention Tray x1 User s Manual x1 IEC Socket Power Cord Stand x2 Power Cord Retention Cable Clip x18 M3x4 Screws x15 Cable Tie x18 Power Cord 10 feet IEC 320 C13 C14 x2 ...

Страница 5: ... green LED D Output Indicator indicates load condition of the ATS PDU E Multifunction LCD Readout display various ATS PDU information such as power and load conditions F Select Button use to control the LCD display and toggle through the available informational options G Enter Button use to choose selected items enter to next level menu or return to previous menu H AC Inlet AC Power Cord use to co...

Страница 6: ...o attach the Mounting Brackets 2 to the ATS PDU Step 2 ATS PDU Mounting Use the Washers 4 and Screws 4 provided to secure the ATS PDU to your existing rack system Step 3 Cord Retention Tray Installation optional Attach the Cord Retention Tray to the ATS PDU with the 4 Cord Retention Tray Mounting that are provided Use the Cable Ties provided to fasten each power cord to the Cord Retention Tray CAU...

Страница 7: ... LCD diaplay on the front of the ATS PDU to monitor the load being attached Network Installation Performed when a Power Management Card is installed Step 1 Attach the LAN Cable Using a CAT5 RJ45 cable attach one end to the Ethernet port on the PMCard and the other end to a network port Step 2 Establish the ATS PDU IP address Assigning an IP address to the ATS PDU requires the user to have an avail...

Страница 8: ... the PC server must be connected directly to the ATS PDU via the serial port 1 Use the included RJ45 DB9 serial port connection cable attach one end to the serial port on the front of the ATS PDU and the other end to the PC server 2 Open the Hyper Terminal software on your PC and select a name and icon for the connection 3 Setup the COM port settings using the following values Bits per second 3840...

Страница 9: ...ug and fasten the Retention Cable Clip like the figure below Power Cord Retention Clip Installation Step 1 Remove the screws next to the outlet where IEC Socket Power Cord Stand will be installed Step 2 Attach the IEC Socket Power Cord Stand on the ATS PDU and secure it with the screws removed in the previous step Note When securing the stand the left side will be angled slightly upward and the ri...

Страница 10: ...e into the Cable Clip as shown in the figure below Step 5 Push the Power Cord Retention Cable Clip until it touches the plug and fasten the Retention Cable Clip like the figure below Removing the Power Cord Retention Clip Step 1 Remove the Power Cord Retention Clip by pushing it to the right as shown in the figure below Step 2 Remove the Power Cord Retention Clip by pulling the clip show in the im...

Страница 11: ...ure the Setting of Telnet and SSH on the Web Interface The default user name and password is admin admin SNMP The ATS PDU supports SNMPv1 and SNMPv3 Remote Management protocols Download the MIB file and add it to a SNMP supporting management software Default read write community is public privated for SNMPv1 SNMPv3 provides a higher security level than SNMPv1 by encrypting the transmitted packet C...

Страница 12: ...Reboot Reset All ATS PDU PMCARD and LCD Reset Except TCP IP Reset Account User Name and Password Reboot LED Indicators Indicator Status Description Source Solid Green Selected source and power condition is normal Flashing Green Backup source and power condition is normal Orange Power condition is abnormal Load Green The aggregate current of each bank is normal Orange Near overload Red Overload Tx ...

Страница 13: ...utdown Step 1 PC Configuration 1 Install PowerMaster Client on every computer server that will be part of the shut down process Follow the instructions in the PowerMaster Client user manual 2 Configure the settings in PowerMaster Client See the PowerMaster Client User Manual for additional help Step 2 ATS PDU Configuration Verify that the IP address of all computers that will be part of the shut d...

Страница 14: ...rectly If the problem remains contact technical support Amperage displayed on LCD Display exceeds the units capability Overload The load indicator shows red when overload Reduce the load on the ATS PDU until the overload is gone If the problem remains contact technical support Circuit breakers have tripped 1 Sustained overload 2 Excessive ambient or internal temperatures 3 Faulty breaker Reset Bre...

Страница 15: ...ration 1 Preferred Source A 2 Sensitivity High 3 Voltage Range Medium 4 Frequency Deviation 1 Hz 5 Nominal Voltage 230 V 6 Wide Voltage Range 30 V 7 Medium Voltage Range 23 V 8 Narrow Voltage Range 16 V 9 Set Load Restriction Switched Series Only Outlet Manager 1 Outlet Control 2 Outlet Configuration Load Configuration 1 Device Threshold Configuration 2 Bank 1 Threshold Configuration 3 Bank 2 Thre...

Страница 16: ...stablishing IP addresses on ATS PDUs Installation Step 1 Download the Power Device Network Utility software Step 2 Select Next in the software wizard Shown in Figure 1 Figure 1 Step 3 Choose an installation directory Select Next Shown in Figure 2 Figure 2 Step 4 Select Install to confirm the settings and install Shown in Figure 3 ...

Страница 17: ...ure 4 Launch Program To launch the Power Device Network Utility and get started select Programs from the Start menu in Windows and locate the new folder and icons for Power Device Network Utility Select Power Device Network Utility from the program folder Shown in Figure 5 Figure 5 Power Device Network Utility ...

Страница 18: ... If it still does not appear ensure that the ATS PDU is turned on and is installed correctly Pressing Stop will cancel the scan refresh process Note If your computer has a software firewall installed you may see a Windows Security Alert message Shown in Figure 7 In Windows XP SP2 the default firewall alert message is shown as Figure 7 You need to allow the Power Device Network Utility access throu...

Страница 19: ...in Figure 9 Authentication screen Advanced Settings Timeout Settings The Timeout Setting Shown in Figure 10 Edit Timeout Settings is used to specify the wait time when scanning for network ATS PDUs When there are many devices on the local network it may take extended periods of time to locate all the devices The timeout function is used to limit the search time The default setting is 3 seconds Val...

Отзывы: