ComCo Systems Inc. | 800.533.3794 | www.comcosystems.com
500628 Rev B
12
921
Series
Dual Pack Blower Module
(P/N: 200217-2(x2))
Line Voltage Installation
For Installation of this unit refer to construction site plans or cut sheet for locating the unit. If the blower
is installed in a closed canopy, the exhaust port must be vented to outside air to prevent overheating.
NOTE:
There must be (x2) 115VAC @ 20A dedicated circuits within 3.0 ft of the unit. All Line Power must be
done in compliance with the NEC (National Electrical Code) by authorized/qualified personnel.
2-115 VAC 0.5 A Resettable Fuse
2-115 VAC 1.5 A Resettable Fuse
Class 2
Field Wiring
SHOCK HAZARD
Disconnect AC Power before Servicing Unit
*AC Service Disconnect for Unit is
located at the Main Junction Breaker Box*
Use ¼” minimum hardware to
mount unit in place. For
mounting location see cut
sheets for job site.
4-115 VAC 10A
Resettable Fuse
WARNING: SHOCK HAZARD
Disconnect AC Power before Servicing Unit Only to be serviced by Qualified Personnel
*AC Service Disconnect for Unit is located at the Main Junction Breaker Box*
Installation