EQUIPMENT MANUAL FOR SP-2110
SP-2110 QE
Copyright - refer to title page
Page 26
ENU Status : 1-3-1
4 COMMISSIONING
The equipment is easily commissioned, once the cover is removed, programming the equipment is
by dial switches and visual feedback is by LED.
Reserved – do not use
“Antenna port”
MCU reset
Dial switches and LEDs
Reserved – do not use
“Antenna port”
MCU reset
Dial switches and LEDs
Fig 10: Dial Switches and MCU area