Com-Power CLCI-100 Скачать руководство пользователя страница 1

 

Page 1 of 28

 

INSTRUCTION MANUAL

 

CLCI-100

 BULK CURRENT INJECTION PROBE 

with 

FCLC-100

 CALIBRATION FIXTURE 

 

1912 1 E l T o ro R d  

   Si l vera do,  Ca lifo rni a 9 26 76  

  (9 49)  459 -96 00   

  co m-p o wer. com

 

 

REV051917 

 
 
 

 
 

INSTRUCTION MANUAL 

 

For 

 

BULK CURRENT 

INJECTION PROBE 

Model:

 

CLCI-100 

 

and 

 

CALIBRATION FIXTURE 

Model:

 

FCLC-100

 

(optional) 

 

 
 
 
 

 
 
 
 
 

 
 
 
 
 

 
 
 
 

 
 
 
 
 

 

 

All manuals and user guides at all-guides.com

all-guides.com

Содержание CLCI-100

Страница 1: ...ALIBRATION FIXTURE 19121 El Toro Rd Silverado California 92676 949 459 9600 com power com REV051917 INSTRUCTION MANUAL For BULK CURRENT INJECTION PROBE Model CLCI 100 and CALIBRATION FIXTURE Model FCL...

Страница 2: ...cations for FCLC 100 Calibration Fixture 10 3 6 Product Dimensional Diagrams 11 3 6 1 Dimensions of CLCI 100 Bulk Current Injection Probe 11 3 6 2 Dimensions of FCLC 100 Calibration Fixture 12 4 0 Usi...

Страница 3: ...I 100 Probe into FCLC Calibration Fixture 13 FIGURE 6 Setup for Insertion Coupling Loss in a 50 System 100 Loop 14 FIGURE 7 Setup for Insertion Coupling Loss in a 150 System 300 Loop 14 FIGURE 8 Equiv...

Страница 4: ...100 Bulk Current Injection Probe connections product specifications safety precautions operational instructions calibration instructions measurement guidelines and warranty information Information co...

Страница 5: ...DN Comb Generators Current Probes Emissions Test Systems Conducted Immunity Test Systems Impedance Stabilization Networks ISN Line Impedance Stabilization Networks LISN Antenna Masts Near Field Probe...

Страница 6: ...m Power or your Com Power distributor Please check the contents of the shipment against the package inventory in section 3 2 to ensure that you have received all applicable items 3 2 Package Inventory...

Страница 7: ...structions WATER AND MOISTURE Do not use the instrument near water WALL OR CEILING MOUNTING Do not mount the instrument on a wall or ceiling HEAT The instrument should be situated away from heat sourc...

Страница 8: ...nector Spring loaded Clasps 2 These two 2 clasps when secured over their respective brackets lock the clamp into its closed position Clasp Brackets 3 These two 2 brackets anchor the respective clasp b...

Страница 9: ...erture Center Conductor Rod 2 This is the fixture s center conductor Calibration Fixture Coaxial Ports 3 These are female N type coaxial connectors providing input output connections to the fixture Th...

Страница 10: ...4 7 cm Probe Aperture Diameter 1 575 4 cm Weight 4 5 lbs 2 04 kg Environmental Operating Temperature 40 F to 104 F 5 C to 40 C 3 5 2 Specifications for FCLC 100 Calibration Fixture Technical Product C...

Страница 11: ...CI 100 Bulk Current Injection Probe FIGURE 3 Dimensional Diagram for CLCI 100 Bulk Current Injection Probe CLCI 100 Bulk Current Injection Probe 10 kHz to 100 MHz Max Input 100 Watts CW www com power...

Страница 12: ...verado California 92676 949 459 9600 com power com REV051917 3 6 2 Dimensions of FCLC 100 Calibration Fixture FIGURE 4 Dimensional Diagram for FCLC 100 Calibration Fixture SIDE VIEW TOP VIEW W 7 17 8...

Страница 13: ...The intent of the fixture is to maintain the coaxial structure of the transmission line while allowing the probe to be installed around the center conductor of the coaxial line 4 1 Installation of CLC...

Страница 14: ...present during operation Do not handle probe while test is in progress GROUND PLANE 10 dB 10 dB NORMALIZATION CALIBRATION 50 SYSTEM 100 LOOP OUTPUT RF Network Analyzer with S Parameter Capabilities o...

Страница 15: ...the equivalent calibration circuit along with the associated calculations FIGURE 8 Equivalent Schematic of Calibration Circuit 50 V1 IP CLCI 100 Bulk Current Injection Probe 10 kHz to 100 MHz Max Inp...

Страница 16: ...reproduced during the actual testing process For the purposes of this procedure we will refer to these as METHOD A Signal Generator Output Method and METHOD B Forward Power Method Illustrated in Figur...

Страница 17: ...ion process the forward power of the test generator is recorded The forward power is measured with an RF power meter and power sensor typically connected to the forward port of a directional coupler i...

Страница 18: ...cuit test level Uo for the calibration i e 1 Vrms 3 Vrms 10 Vrms etc The relationship between Umr and Uo is given below So for instance if calibration is being performed for a test level of 10 Vrms Du...

Страница 19: ...tcal signal generator output determined during calibration at highest test level FWDpwrcalc calculated forward power for lower test level FWDpwrcal forward power measured during calibration at highest...

Страница 20: ...ut 100 Watts CW www com power com CAUTION Hazardous voltages present during operation Do not handle probe while test is in progress CLCI 100 Bulk Current Injection Probe 10 10 kH kHz t to 10 100 M 0 M...

Страница 21: ...CLCI 100 Bulk Current Injection Probe 10 kHz to 100 MHz Max Input 100 Watts CW www com power com CAUTION Hazardous voltages present during operation Do not handle probe while test is in progress CLCI...

Страница 22: ...ion 4 4 2 1 3 Record either a the frequency fx and amplitude setting of the signal generator SGout or b the frequency fx and forward power measured using the power meter sensor FWDpwr See examples of...

Страница 23: ...he present test frequency or b the level at which the power indicated by the power meter is equal to the respective FWDpwr value determined during calibration for the present test frequency 3 Record t...

Страница 24: ...t is performed from the lowest test frequency to the highest test frequency one test frequency at a time with a one to three second dwell time at each test frequency The RF carrier is typically 80 amp...

Страница 25: ...ECEIVER INPUT EQUIPMENT UNDER TEST EUT AUXILIARY EQUIPMENT AE CLCI 100 Bulk Current Injection Probe 10 kHz to 100 MHz Max Input 100 Watts CW www com power com CAUTION Hazardous voltages present during...

Страница 26: ...e 10 kHz to 100 MHz Max Input 100 Watts CW www com power com CAUTION Hazardous voltages present during operation Do not handle probe while test is in progress FRONT VIEW www com power com FCLC 100 CLC...

Страница 27: ...to repair damage resulting from attempts to install repair service or modify the instrument by personnel other than Com Power service representatives Under no circumstances does Com Power recognize o...

Страница 28: ...00 com power com REV051917 6 0 Typical CLCI 100 Calibration Data Typical Insertion Loss Values Transfer Impedance Factors Meter Reading dBuV Transfer Impedance Factor dB Current Reading dBuA 0 5 10 15...

Отзывы: