
5
All installations must conform to the requirements of the
authority having jurisdiction. Such applicable require-
ments take precedence over the general instructions of
this manual.
Where required by the authority having jurisdiction, the
installation must conform to the American Society of
Mechanical Engineers Safety Code for Controls and Safety
Devices for Automatically Fired Boilers, ANSI/ASME No.
CSD-1.
LOCATE BOILERS in front of final position before remov-
ing crate. Provide a level solid base as near the chimney
as possible, and centrally located with respect to the heat
distribution system as practical.
Allow 24 inches in the front and top for servicing and clean-
ing, or removing tankless water heating coil.
When installed in a utility room, the door should be wide
enough to allow the largest boiler part to enter, or to permit
replacement of another appliance such as a water heater.
FOR INSTALLATION ON NON-COMBUSTIBLE
FLOORS ONLY.
The boiler must not be installed on carpet-
ing or vinyl flooring. Minimum clearances to combustible
construction are:
TOP ........................................................24 IN.
FRONT ..................................................24 IN.
FLUE CONNECTOR ............................ 9 IN.
REAR ....................................................... 6 IN.
SIDES ....................................................... 6 IN.
REMOVE CRATE
and plastic protective wrapper and in-
spect for damage. All equipment is carefully manufactured,
inspected and packaged by experienced workers. Our
responsibility ceases upon delivery of the crated boiler to
the carrier in good condition. Any claims for damage or
shortage in shipment must be filed immediately against the
carrier by the cosigner. Move boiler to permanent position
by sliding or walking.
iNTROdUCTiON
!
WARNING
Improper installation, adjustment, alteration,
service or maintenance can cause property
damage, personal injury or loss of life.
!
WARNING
BOILER MAY NOT BE INSTALLED ON
COMBUSTIBLE FLOORING.
NOTICE
Clearance for access should exceed fore
protection clearance.
Содержание CSFH-3 WATER
Страница 31: ...NOTES ...
Страница 32: ...Date Service Performed Company Name Tech Initials Company Address Phone ...