background image

Processing of Samples

   

Warning

 - remember high temperatures are dangerous. The heater, insert blocks, sample

 

 

  vessels, needles and samples may be very hot. Always take the precautions listed earlier in this manual.

1.   By turning the carriage handle, on the right hand side, counter clockwise raise the gas chamber to take the 

needles well away from the heater.

2.   Place the sample vessels in the insert blocks and lower the chamber so that the tips of the needles enter the 

test tubes. Position them at the required height above the liquid surface.

3.   Set the heater to the required temperature and adjust the gas flow to the desired rate. Remember not to 

exceed 2 psi.

4.   To increase the rate of concentration the chamber may be lowered as evaporation takes place so that the 

needles follow the level of the samples in the tubes. Using the scale on the column fine adjustments are easily 
made.

5.   On completion switch off the gas flow and raise the chamber out of the way.

6.   For operation of the Dri-Block

®

 see the user's manual supplied separately.

Maintenance

Cleaning and care

With proper care and operation, the equipment should give reliable service, however contamination or general 
misuse may reduce the effective life of the product and could cause a hazard. 

Preventative maintenance should include keeping the product clean by protecting it from spillage, contamination 
or corrosive environments. If in doubt, please confirm that any intended method of decontamination will not 
damage the equipment by contacting Cole-Parmer. 

Your Sample Concentrator can be cleaned by wiping with a cloth dipped in soapy water. Ethanol and    
formaldehyde may also be used.

NOTE:  

Do not use solvents or abrasive cleaners for cleaning any parts of this equipment.

Carriage friction

Height adjustment is by means of a friction drive. To allow for wear the friction pressure may be increased by  
tightening the 4 screws on the rear of the carriage sufficiently to give adequate grip.  Ensure that all four are  
tightened equally.

Replacing Sealing Pad

After many repeated needle insertions the self sealing property of the sealing pad may start to degrade.   
Spare pads can be obtained from your supplier or from Techne. Replacing the pad is simply accomplished as  follows:

v

  Remove the gas chamber from the carriage, disconnect the gas pipe and place upside down on a    

 

suitable work surface.

v

  Remove the four screws securing the matrix plate.

v

  Lift off the matrix plate.

v

  Lift off the sealing pad. Ensure that the support strip underneath the sealing pad remains in place.

v

  Replace the sealing pad with the new one. Reassembly is the reverse of the above procedure.

7

Содержание Techne FSC400D

Страница 1: ...Sample Concentrator FSC400D FSC496D Instruction Manual TECH0002 Version 1 0...

Страница 2: ...essing of Samples 8 Maintenance 8 Cleaning and Care 8 Carriage Friction 8 Replacing Sealing Pad 9 In Case of Contamination 9 Service and Repair 10 Warranty 10 Replacement Parts and Accessories 10 Diag...

Страница 3: ...into the test tubes The samples are heated from below by the heater and the flow of gas directed over the surface of the samples displaces the evaporated solvent from above the liquid s surface This s...

Страница 4: ...e carriage Tighten the locking knob to secure the gas chamber in position 3 Connect the intake nozzle at the rear of the gas chamber to a suitable supply of gas via a pressure reducing valve The gas p...

Страница 5: ...F3506 you would place a needle in all the holes labelled C Only Sample Concentrators with the part number FSC496D or a replacement head part number 6106467 will have the 96 well array Tube size diamet...

Страница 6: ...FSC400D matrix plate FSC496D matrix plate Inserting the Needles 6...

Страница 7: ...the product and could cause a hazard Preventative maintenance should include keeping the product clean by protecting it from spillage contamination or corrosive environments If in doubt please confirm...

Страница 8: ...ntamination Certificate Servicing and Repair This product range does not require any routine servicing instructions for cleaning and decontamination are included In the event of product failure it is...

Страница 9: ...F7210 Pack of 100 x 127mm long needles FSC4NCS Pack of PTFE coated needles 100 x 76mm long FSC4NCL Pack of PTFE coated needles 100 x 127mm long 6101608 Spigot 6101604 Sealing pad 6101605 Support strip...

Страница 10: ...e diameter 6 35 mm Height 530 mm Width 240 mm Depth 295 mm Weight 3 5 Kg Customer and Technical Support For help and support contact Cole Parmer Ltd Beacon Road Stone Staffordshire ST15 0SA United Kin...

Страница 11: ...acid Ethanoic acid 118 44 Ethanol Alcohol 79 175 Ethyl acetate Ethyl ester 77 40 Heptane Dipropylmethane 98 120 Hexane n Hexane 69 335 Propan 2 ol Isopropanol 82 137 3 Methyl 1 butanol Isoamyl alcohol...

Страница 12: ...g the details below UK Office Keison Products P O Box 2124 Chelmsford Essex CM1 3UP England Tel 44 0 330 088 0560 Fax 44 0 1245 808399 Email sales keison co uk Please note Product designs and specific...

Отзывы: