![Codume X-Vent II 300 Скачать руководство пользователя страница 8](http://html.mh-extra.com/html/codume/x-vent-ii-300/x-vent-ii-300_operating-manual_2634217008.webp)
CODUME
Page 8
3.2 Mounting unit in wall frame
1
Start by finding the centre of
the wall frame using a ruler.
The centre measurement for
the wall frame is 62 cm. Mark
the measurement.
2
Next mark the middle of the
wall or the location you wish
to place the centre of the unit.
3
Now line up the two marks.
If you like, you can place the
wall frame all the way up to
the ceiling. If you do this,
there will be a 6 mm gap
between the top of the unit
and the wall.
4
Now that the wall frame is
provisionally hung, you can
mark holes for screws and the
centre of supply and exhaust.
The duct size is Ø200mm.
The recommended hole
diameter is Ø210-215 mm, so
the pipes can be insulated
subsequently.
5
Horizontally measure and
mark distance down to centre
of supply/exhaust, and mark
centre in vertical direction.
Содержание X-Vent II 300
Страница 1: ...CODUME sa X Vent II 300 Installations and Operations Guide Version 2011 06 24...
Страница 24: ...CODUME Page 24 5 6 Capacity data Operation Capacity at 35 dbA Operation Capacity at 30 dbA...
Страница 25: ...CODUME Page 25...
Страница 26: ...CODUME Page 26 5 7 On site testing of air volumes...