Code Blue
•
259 Hedcor Street
•
Holland, MI 49423 USA
•
800.205.7186
•
www.codeblue.com
GU-156-I
page 21 of 26
CB 6 Series
Administrator Guide
14 WM-180 Pole Mount Installation Instructions
1.0 THREAD MOUNTING STRAPS THROUGH SLOTS
2.0 HOLD BRACKET TO POLE
– Set the bracket at the desired height for the Public Address Speak-
ers 180°.
3.0 BAND THE BRACKET TO THE POLE AT DESIRED HEIGHT
3.1 To eliminate waste, pull band
(A)
from carton as needed. With ears of buckle
(B)
away from
operator, slide the buckle on the banding. Lace banding around the object being clamped and
again through buckle.
3.2 Bend end of band under buckle.
3.3 Slide band in banding tool nose slot. Press down on gripper with thumb and tension clamp by
turning the handle. Maximum tension has been reached when the band stops moving through
the buckle.
3.4 When maximum tension has been reached, roll tool over buckle, at same time reversing handle
carefully at approximately three-quarters turn to avoid breakage. The band that is released will
be used in the bend and therefore there is no loss of tension.
3.5 Lift cutter lever and the band will be cut to correct length.While holding the stub of the band
with your thumb, hammer flat over bridge of buckle.
3.6 Complete application by hammering the buckle ears over the stub.
4.0 ATTACH ENCLOSURE TO BRACKET
4.1 Place a rubber washer
(D)
on each of the four studs.
4.2 Align and place the back plate of the unit over the four studs.
4.3 Place a second set of rubber washers on each of the four studs (inside the unit).
4.4 Place a steel washer
(E)
on each of the four studs.
4.5 Turn a nut
(F)
on each of the four studs.
Banding tool sold separately on
the Parts Order Form, part #41441.
Specifications subject to change without notice or obligation on the part of the manufacturer.
Bird Eye View
(banding)