Cobra Maxilift 5500 Скачать руководство пользователя страница 35

31

ATTENTION

The outrigger beams are in their working position when the yellow band existing on every beam
can be entirely seen.

• Lower to the ground the bearing pads of the outriggers jacks, one at a time, acting as follows:

Hydraulic jack (Fig. 16)

Open the shut-off valve (

1

) to allow the lowering to ground of the cylinder’s pad and rod (

2

). The valve is

open when its lever is on position “

A

”. Operate the corresponding lever of the control valve until the pad

reaches the ground. Avoid to lift the truck off the ground unloading the vehicle suspension, this reduces
greatly the stability of the truck. Then, turn again the valve lever to its previous “

C

”closed position.

Mechanical jack (Fig. 17)

Lower the pad (

4

) by pulling the locking pin (

5

) out of its housing. The telescope and the pad will come down

because of gravity. When it is close to ground, engage again the pin in the appropriate hole, securing it with
the relevant safety retainer (

6

). Turn the crank handle (

7

) until the ground is reached, bearing in mind what

was explained  above regarding the vehicle suspension.

Swinging hydraulic jack (Fig. 18)

When swinging jack are fitted, before operating the shut-off valve (

1

) make sure that the jack (

2

) is in vertical

position, with its pad (

3

) oriented downward, its pin (

4

) secured with the retainer spring (

5

). If not, take off the

pin, turn the jack downward and then lock in the working position in the aforesaid way. Then open the valve
(

1

) as already explained (hidraulic jack), operate the corresponding lever of the control valve and lower the

pad to the ground as described before. When duly positioned, close the valve (

1

) as described.

ATTENTION

When turning the swinging jack and removing its pin, be careful and hold it up, to prevent it from
falling down because of gravity , resulting in damage or injuries.

• Repeat this sequence of operations for the outrigger jack on the other side of the truck and for every

other jack fitted on the truck. Make sure that the vehicle is level, in order to have a good stability.

Maximum allowed angle is 3°.

IMPORTANT

Proper leveling has to be checked by means of a level instrument fitted on the truck.

Pict. 18

1

2

1

2

3

A

C

4

6

5

7

5

4

1

6

2

3

Pict. 15

Pict. 16

Pict. 17

Содержание Maxilift 5500

Страница 1: ...SERVICE CRANE Mod 5500 USE AND MAINTENANCE MANUAL Code MD 0 176 Rev 0 Edition 07 09...

Страница 2: ...editerraneo 6 I 42022 BORETTO Reggio Emilia In this booklet the word Manufacturer is referred to NEXT HYDRAULICS S r l List of documentation supplied along with the CRANE Operator s and maintenance ma...

Страница 3: ...n the crane operation 10 5 4 Rules concerning safety in the traffic 10 5 5 General rules on winch operations 11 5 5 1 Winch system operation 11 5 5 2 Operator safety tips 11 5 5 3 General rules when o...

Страница 4: ...ne operator 34 8 2 Daily check list 34 8 3 Safety tips for crane starting in cold climates 34 8 4 Crane protection and storage 34 8 4 1 Short shutdowns 34 8 4 2 Long shutdowns 35 9 MAINTENANCE 36 9 1...

Страница 5: ...these instructions are not a training manual for beginners or unskilled operators it must be stressed that as a fundamental presupposition only skilled and professional crane operators are allowed to...

Страница 6: ...led to the Custo mer and shall be inserted in the manual at his care and cost 2 HOW TO CONSULT THE MANUAL 2 1 INSTRUCTIONS Always carefully read this manual before operating the crane In this manual t...

Страница 7: ...oportional mono function Fed by a punp driven by a P T O truck 12 24V 5500 RKP E Radio Proportional mono function Fed by a DC electro hydr power pack 12 24V 5500 RKPD H Radio Proportional dual mode Fe...

Страница 8: ...difications or structural interventions without the approval of the Manufacturer To operate the crane out of the admittable range of temperatures 30 C 50 C 22 F 122 F Any of the above mentioned improp...

Страница 9: ...equired for safe operation adequate hearing with or without a hearing aid sufficient strength endurance agility and coordination to meet equipment operation demands emotionally stable not subject to s...

Страница 10: ...lment from the opera tor s side of current rules laws and regulations The crane is designed to be used within the 30 50 22 F 122 F temperature range and has to be operated only in this range The manuf...

Страница 11: ...rigger s reaction look at the plate applied on the outrigger jack Admittable pressure on various types of soils look at the following table for indicative values Bearing pressure calculation When Then...

Страница 12: ...n disconnected by expe rienced people or when the lines status is unknown Voltage V minimum distance m ft up to 1000 v 1 4 from 1 kV to 110 kV 3 10 from 110 kV to 220 kV 4 13 from 220 kV to 380 kV 5 1...

Страница 13: ...nd of the cable with the point of connection indicated en on the crane base DANGER electrocution hazard The ground cable must be connected only on the indicated point on the crane base Avoid any linka...

Страница 14: ...slender rods are moved 5 strong 8 10 7 26 35 29 38 17 24 small waves on water surfaces breeze 6 strong 10 8 13 8 35 45 39 49 24 30 rods are bent it is difficult to use wind umbrella 7 tight 13 9 17 1...

Страница 15: ...e load to be lifted When using multi part reeving be sure cable is properly routed Know the lifting capacity of both the winch and boom They will have different capacities The weight of the load must...

Страница 16: ...ort such as a non functioning sheave Severe abrasion caused to outer wire strands will result from friction 3 Do not use worn sheaves or flat grooved sheaves They do not provide support to the full ra...

Страница 17: ...7 Second hydraulic boom section 8 First telescope cylinder 9 Second telescope cylinder 10 Hydraulic unit 11 Electronic Power unit 12 Cable or radio remote control box 13 Winch 14 Travelling block 15...

Страница 18: ...nd hydraulic boom section 8 First telescope cylinder 9 Second telescope cylinder 10 Hydraulic unit 11 Electronic Power unit 12 Cable or radio remote control box 13 Winch 14 Travelling block 15 Elettro...

Страница 19: ...ter or manipulate the safety devices Before operating the crane make sure that all the safety devices are in perfect working conditions 6 3 2Load limiting device The load limiting device system locks...

Страница 20: ...e of 45 upwards with the boom sections partially extended switch the truck engine off push and pull repeatedly all the control switches the load must remain still 6 3 5 Safety devices sealing Some saf...

Страница 21: ...m is consisting of the following main components Pict 7 1 Control and safety devices managing con trol unit 2 Remote control keyboard 3 Directional and flow regulating hydraulic unit 4 Electrical conn...

Страница 22: ...with an ergonomic and practical remote control device to optimize the different crane functions It is mainly made up of a plastic container with a protected control panel integrally connected to a su...

Страница 23: ...rcular magnet located on the rear that allows placing the keyboard on metallic surfaces WARNING Verify the emergency button correct operation 5 before using the radio control The radio control must be...

Страница 24: ...nsisting of two separate aluminium blocks The upper section includes the proportional adjusting valve VR and the manual bypass control valve OM of the proportional regulator The lower section includes...

Страница 25: ...manual override of the valve coupled to the desired movement extension re entry boom lowering etc c Finally Fully turn counter clockwise the manual override of the valve EV9 in order to activate the...

Страница 26: ...TTENTION Do not operate the proportional button before selecting the movement it will not work Do not pull immediately the proportional button to its maximum limit you will not get the right gradualne...

Страница 27: ...onal button is switched on a continuous and fast blinking signal indicates that the keyboard is tuned to the auxiliary channel for example when the RFID code radio frequency identifier exclusively use...

Страница 28: ...ing out whichever movement by selecting the function it must appear When the overload condition is almost reached the display shows When the crane goes gets locked by the LLD overload the display show...

Страница 29: ...4 O_r open circuit VR proportional valve The system through simple operations allows to enter other menus which can be helpful for the operator or a technician from the After Sales Service These menus...

Страница 30: ...pressure transducer When no operation is activated the electronic control unit automatically switches to the Normal Display Menu after 60 seconds otherwise a new power on is required in order to get...

Страница 31: ...ovements activated simultaneously only the state of the first received command is displayed Example indication without any active movement Example indication when the contact 1A is closed on the remot...

Страница 32: ...ulic pressure in bar This menu can be accessed from the normal display menu through the following procedure Fully press the proportional button and simultaneously start maneuver 1A and the STOP select...

Страница 33: ...nned joints and the hook pin are safely locked by their retainers Lifting tackles chains or ropes must be applied to the hook in such a way that will not damage the hook safety latch Whilst swinging t...

Страница 34: ...h the truck battery The connection is made turning on the emergen cy button pict 9 P located on the remote control The electric pump will start every time a switch of the remote control is moved The c...

Страница 35: ...ng in mind what was explained above regarding the vehicle suspension Swinging hydraulic jack Fig 18 When swinging jack are fitted before operating the shut off valve 1 make sure that the jack 2 is in...

Страница 36: ...roviding the proper operating safety factor on the wire rope supplied with the machine Therefore any replacement rope must meet the rope specifica tions for size construction and strength as outlined...

Страница 37: ...om sections are not correctly installed The load is not correctly slinged So the lifting accessory used chain rope etc breaks or flips out and the load falls down to earth The boom suddenly unloaded s...

Страница 38: ...lings hooks ropes and chains of certified origin and in perfect conditions 7 Before starting crane operations check the efficiency of the safety control devices Never use the crane if the correct func...

Страница 39: ...stickers water entering inside the electrical components and the slewing case 8 4 2Longshutdowns Same precautions as above and moreover apply protective oil on the entire crane surface cover the cran...

Страница 40: ...id dirt on crane components or assemblies breaking of ropes or slings safety valves load limiting device or other safety devices out of service or not in good working conditions hydraulic plant in bad...

Страница 41: ...tely a doctor Do not heap dirty rags with oil or grease they may be a danger of fire Instead put them in a metallic closed case Immediately replace any missing sticker or plate carrying a notice of da...

Страница 42: ...xmoths Wash and clean the crane ATTENTION Never wash the crane with chemical products or high pressure water jets as they can cause the detaching of the stickers and water entering inside the electric...

Страница 43: ...ortant to carry out a bleeding of the circuit otherwise the air introduced in the system with this operation may damage the sealing parts To do that operate every function of the control valve driving...

Страница 44: ...ions Pict 22 1 Completely extend the telescopic boom 2 Grease the lower part of the extensions by a brush 3 Grease the upper part of 1st extension by the two grease nipples pos A 4 Move the grease nip...

Страница 45: ...EACON GR MU ATHESIA ENEGREASE EP2 MP EP2 EP2 EP2 LR MP GREASE MULTIS MOBILGREASE BEACOM GR MU ATHESIA ENERGREASE LR MP MP EP2 EP2 EP2 EP2 HYDRAULIC AZOLLA DTE NUTO OSO HYDRUS HENERGOL OIL ZS 46 25 H 4...

Страница 46: ...e depends upon the good judgement of an experienced person in evaluating the remaining strength in a used rope after allowance for deterioration disclosed by inspection The following reasons are suffi...

Страница 47: ...ese ropes should be cleaned before being lubricated The lubricant applied should be light bodied enough to penetrate to the core of the rope Lubricant may be applied effictively by various methods It...

Страница 48: ...r Defective pump Uncorrect settings of the valves Hydraulic cylinder sealings are worn Uncorrect settings of the valves Hydraulic cylinder sealings are worn Lacking of lubrication Defective holding va...

Страница 49: ...Solenoid valve jammed in open position dirt working shaving long inactivity pe riods Manual operator where foreseen acti vated Solenoid valve V4 jammed in closed position dirt working shaving long in...

Страница 50: ...nual functions only for emergency Two hydraulic extensions Stop end system for winch up and down TECHNICALDATA5500 Crane rating KNm 35 Standard outreach m 5 65 Slewing angle CONTINUOUS Boomelevation 5...

Страница 51: ...PORTIONAL Pump capacity hydraul H pto GPM 3 2 Working pressure psi 2 500 Crane weight lbs 1 000 H 1060 E Slewing torque ft lbs 2 500 WINCHSPECIFICATION5500 Winch pull line lbs 2 700 Pull line speed H...

Страница 52: ...48 Pict 26 11 WIRINGAND HYDRAULIC DIAGRAMS 11 1 ELECTRICALDIAGRAMS...

Страница 53: ...ckw rotation electrov solenoid EV1B Counter clockw rotation electrov solenoid EV2A Boom lifting electro valve solenoid EV2B Boom lowering electro valve solenoid EV3A Extensions electro valve solenoid...

Страница 54: ...Rotation motor 4 Lifting cylinder 5 Overcenter valve 6 Pressure switch 7 1st extension cylinder 8 2st extension cylinder 9 Overcenter valve 10 Sequence valve 11 Oil filter 12 Oil tank 13 Swivel hydra...

Страница 55: ...or 4 Lifting cylinder 5 Overcenter valve 6 Pressure switch 7 1st extension cylinder 8 2st extension cylinder 9 Overcenter valve 10 Sequence valve 11 Oil filter 12 Oil tank 13 Swivel hydraulic coupling...

Страница 56: ......

Страница 57: ...it Name of the installer person Name of the authorized installer workshop Address City Province State Tel number Date Reproduction and distribution are forbidden according to law without written permi...

Страница 58: ...NEXT HYDRAULICS s r l Via Mediterraneo 6 42022 Boretto Reggio E Italy Tel 0522 963008 Fax 0522 963039 e mail nexthydraulics tin it...

Отзывы: