Service manual
- 26 -
8.6 Re-air purging (Re-installation)
Procedure:
1. Confirm that both the 2-way and 3-way valves are set to the closed position.
2. Connect the charge set and a charging cylinder to the service port of the 3-way valve.
3. Leave the valve on the charging cylinder closed.
4. Air purging.
5. Open the valves on the charging cylinder and the charge set. Purge the air by loosening the flare nut
on the 2-
way valve approximately 45’ for 3 seconds then closing it for 1 minutes; repeat 3
times.
6. After purging the air, use a torque wrench to tighten the flare nut to on the 2-way valve.
7. Check the gas leakage.
8. Check the flare connections for gas leakage.
9. Discharge the refrigerant.
10. Close the valve on the charging cylinder and discharge the refrigerant until the gauge indicate 0.3 to
0.5 Mpa.
11. Disconnect the charge set and the charging cylinder, and set the 2-way and 3-way valves to the
open position.
12. Be sure to use a hexagonal wrench to operate the valve stems.
13. Mount the valve stems nuts and the service port cap.
Be sure to use a torque wrench to tighten the service port cap to a torque 18N.m.
Be sure to check the gas leakage.
Содержание CIC-09M1Z
Страница 1: ...MODEL CIC 09M1Z CIH 09M1Z CIC 12M1Z CIH 12M1Z CIC 18M2Z CIH 18M2Z CIC 24M2Z CIH 24M2Z SERVICE MANUAL ...
Страница 13: ...Service manual 10 5 Refrigerant cycle diagram Cooling only Heat pump mode ...
Страница 23: ...Service manual 20 Indoor Outdoor CIC 24M2Z ...
Страница 24: ...Service manual 21 Indoor same with the indoor wiring diagram Outdoor CIH 24M2Z CIC 24M2Z ...