9
vii. After cleaning the quartz tube, wash it off with water and wipe
dry with a soft towel.
viii. Make sure the inside of the quartz tube is dry before installing
the UV lamp.
6E. Quartz Tube Installation
i. Place the sealing ring on the quartz tube 3/4 inch from the
open end.
ii. Insert the quartz tube partially into the UV chamber. Place the
lamp retainer over the open end of the quartz tube and slowly
push in until it is touching the UV chamber cap.
iii. Place the retainer washers onto the retainer screws and tighten
the lamp retainer screws until the lamp retainer is completely
seated against the UV chamber cap.
iv. After spa is refilled, turn the spa ON and check the seal around
the lamp retainer for leaks.
v. If the unit leaks, please contact customer support at following
number: 1-800-733-9060.
vi. SHUT DOWN the spa once you have confirmed that there are
no leaks.
vii. Install the UV lamp as described in Section 6B.
viii. Reinstall the upper enclosure assembly to the enclosure base.
ix. The unit is now ready for normal operation.
6F. Standard Replacement Parts List
i. Replacement UV Lamp Assembly
9-1100-01
ii. Quartz Tube Replacement Kit
9-1204-01
iii. Sealing
Ring
7-1981-01
SECTION 2 Maintenance Instructions
Содержание DEL UV SPA
Страница 11: ...11 NOTES...
Страница 12: ...CMP LLC 36 HERRING ROAD NEWNAN GA 30265 WWW C M P COM DEL 4 2769 01 Rev B_0921ab...