3. INSTALLATION INSTRUCTIONS
3.1 DECK CANISTER INSTALLATION
NOTE: Prior to installation, make sure the
opening on the Laminar canister lid is facing
toward the desired target location in the
pool. Make sure the deck canister is no more
than 5’ from the interior pool wall.
1. Dig a hole for the deck canister
approximately 24” deep and 18” in
diameter. This will ensure enough room for
positioning the canister and laying out the
plumbing. This depth will also allow for an
additional layer of pea gravel for stability
and extra drainage.
2.
Set the deck canister in the hole. For “in-
deck” applications - level the top edge of
the lid to be flush with the finished deck
after the decking material is poured. For
planter areas - level the lid to be 2” above
the landscape area to prevent debris from
washing into the laminar jet.
3.
Level the deck canister. To hold the
canister in place while the deck is poured
or installed, secure canister by placing the
center stake socket on a 1” pipe or use
rebar sockets on the side of the canister.
4.
Plumb the incoming filtered water supply
to the 1” inlet on the side of the deck
canister, which is marked “WATER.”
5. Plumb the conduit for the LED cable to the
3/4" socket located either side of the deck
canister marked “ELECTRICAL.” It is highly
recommended to use sweep fittings for
ease of installation.
6. Plumb the 1" drain line to the drain
socket. Adequate drainage must be
provided for the deck canister.
NOTE: Proper drainage for the deck
canister is critical to avoid damage to
laminar jet assembly.
7.
Verify the canister is level.
8.
Fill excavated area with gravel until gravel
reaches 1" up from the bottom of the deck
canister.
9.
Finish pouring/installing deck material.
10.
Do not remove clear protective film on the
deck canister lid until after the pool deck
has been installed. This is intended to keep
foreign debris from damaging or clogging
the Laminar.
FIGURE 4: FINISH HEIGHT
FINISH DECK
HEIGHT