VinciLab User’s Guide
| 33
the suffix ‘(Standard)’ from the diagram’s name and makes it a user-defined diagram.
On starting a measurement graph(s) are drawn in pre-defined diagrams. Notice that
when starting a new measurement run, the existing data is overwritten by the new data
without warning. You can collect several measurement runs for comparison by using the
Copy column
option from the Tool menu.
•
Tap
to go to the Diagrams Screen.
•
Tap
again to see all available diagrams and to select another diagram.
•
Tap
to open the Tool menu.
D
IAGRAMS
S
CREEN
T
OOL
M
ENU
−
Zoom to Fit
(only for a diagram with data)
- to optimally zoom in the graph.
−
Zoom Out
(only when in zoomed state)
- to return to the previous zoom state.
−
Scan
(only for a diagram with data)
-
to read co-ordinates of points in the graph.
When scan is started use
Stop Scan
- to stop the scan.
−
Erase all Values
(only for a diagram with data)
- to remove all data.
−
Sketch
- to draw a prediction graph or a graph, which can be converted to real
data. After the sketched graph is created use:
o
Convert Sketch to Table
- to convert the sketch to real data
,
or
o
Erase Sketch
- to remove the sketch.
−
New Diagram…
- to create a new diagram.
−
Delete Diagram
- to delete the displayed diagram.
−
Graph Properties …
- to edit the displayed diagram.
−
Graph Style
- to change the display settings of the diagram.
−
Import Background Graph -
to import a graph with data from another Coach
Activity/Result and place as background graph.
o
Shift Background graph –
to move the background graph horizontally, use
Stop Shifting Background Graph
when you are ready.
−
Delete Background Graph -
to delete the background graph.
−
Process/Analyze
- to select data processing and analysis tools.
−
Copy column
(only for a diagram with data)
- to keep previous run(s) active.